ML19350D898

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-266/81-08 & 50-301/81-07 on 810323-27. Noncompliance Noted:Failure to Follow Acceptance Criteria of Major Calibr Procedure
ML19350D898
Person / Time
Site: Point Beach  
Issue date: 04/09/1981
From: Baker K, Gildner M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19350D895 List:
References
50-266-81-08, 50-266-81-8, 50-301-81-07, 50-301-81-7, NUDOCS 8105260318
Download: ML19350D898 (5)


See also: IR 05000266/1981008

Text

-.

.

O

U.S. NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Reports No. 50-266/81-08; 50-301/81-07

Docket Nos. 50-266;50-30I

License No. DPR-24; DPR-27

Licensee: Wisconsin Electric Power Company

231 West Michigan Avenue

Milwaukee, WI 53201

l

Facility Name:

Point Beach, Units 1 and 2

Inspection At:

Point Beach Site, Two Creeks, WI

Inspection Conducted: March 23-27, 1981

Inspector: ff

, , .9, [/

r

-

..A_ x

Approved By:

. Baker, Chief

9' f7

Management Programs Section

'/],'

_ ,

Inspection Summary

Inspection on March 23-27, 1981 (Reports No. 50-266/81-08; 50-301/81-07)

Areas Inspected:

Routine, unannounced inspection of calibration and surveil-

lance of safety-related components and equipment. The inspection involved a

total of 38 inspector-hours ensite by one NRC inspector. None of the in-

spector-hours were spent onsite during offshifts.

Resul t_s :

In the area inspected, the inspector identified one apparent item of

noncompliance.

The apparent item of noncompliance was a failure to follow the

acceptance criteria of a major calibration procedure per Details Paragraph 4.b.

l

l-

t

l

t

.

8 usee yg

q

.

-

-

-

.

- .

.

__

.

-

,

.

.

.

..

DETAILS

.l.

Persons Contacted

-

G. A. Reed, Manager, Nuclear Power. Division.

  • J.'J. Zach, General Superintendent
  • R.'E. Link, Superintendent Engineering,1 Quality,:and Regulatory

J. C. Reisenbuechler, I&C Engineer

  • E. A. LeClair, I&C Supervisor.

M. E. Crouch, Maintenance Supervisor

Additional plant technical and' administrative personnel were-contacted

during the course of the inspection by the inspector.

  • Denotes those personnel present during the exit meeting.

2.

Test Equipment-Calibration

~

The inspector selected the below listed. test equipment used in-the

calibration of safety-related equipment and determined that the-

accuracy of those instruments was traceable to'the National Bureau

,

of Standards or other independent testing agencies: the equipment

wer properly controlled; and storage of equipment was : adequate.

a.

Test. Equipment' Reviewed

_ .,

TI-10

-Mansfield/ Green Deadweight Tester Model T-50

TI-45-

Heise Test Gauge Model CCM6191

'

TI-90

Fluke Digital Multimeter 8600A

TIS-1002 ~ General Radio Decade Resistance 1433-F'

TIS-1009 Fluke D. C. Calibrator Model 3330B

<

I

-

b.

Findings

, .

No items of noncompliance or deviations were identified in this

l

subarca.

3.

Surveillance of Safety Related Components or Equipment

The inspector reviewed plant surveillance / calibration procedures listed

,

j

below. This review was performed to determine if. the surveillance. test

was covered by properly approved procedures;-the procedures contained

.

prerequisites and preparations for the test; the procedures contained

L

functional testing of instrumentation; the procedures included acceptance

cri'.eria; the procedures included operational checks prior to returning

equipment to service; the technical content of the procedures would result

in satisfactory testing.

~

l

1

-2-

.

<

..

.

a.

Documents Reviewed

ICP 2.1 Reactor Coolant. Flow Test

ICP 2.1 Reactor' Power VS Delta T Test

ICP 2.1 Steam' Generator Pressure Test-

ICP 2.1 Containment Pressure Isolation Valve Test

.

ICP 4.1 Reactor Coolant Temperature Calibration

ICP 4.1 and ICP 4.3 Pressurizer Water Level Calibration

ICP 4.1 and ICP 4.8. Containment Spray-Calibration

ICP 4.1, ICP 4.6, and ICP 4.7 Steam Generator Flow Mismatch l

Calibration

ICP 4.12 Accumulator Pressure Cal'bration

i

ICP 4.17 Volume Control Tank Level Calibration

ICP 4.22 Containment Sump Level Calibration

ICP 4.30 Refuel Source Range Drop-In Detector Calibration -

b.

. Findings

!

i

No_ item's of noncompliance or deviations-_were identified in this

subarea,

i

4.

Calibration of- Safety Related Components Required by Technical Specifications

.

The inspector reviewed plant calibration records and selected. logs and.

~

records for the below listed calibration-activities. .'TNi's review was

performed to determine that the frequency of = calibration was met; the

-

l

service status of the system was in conformance with the applicable

limiting conditions of operation; the procedures used to calibrate _the-

o

components were reviewed and approved as required by the Technical

Specifications; the procedures used contained accept ble trip settings -

using applicable technical specification ~ requirements; the procedures

used contained detailed stepwise instructions, the technical content of

the procedures would result in satisfactory calibration; the. trip points

conformed to applicable Technical Specifications; the qualifications of'

two individuals in the I&C Group having responsibilities for performing

calibrations were adequate.

l

a.

Calibration Records Reviewed

Note: All records reviewed were the most recently completed

test / calibration for both units.

ICP 4.2 Reactor Coolant Flow Transmitters

ICP 4.4 Pressurizer Pressure Transmitters

ICP 4.7 Feedwater Flow Transmitters

l-

ICP 4.8 Containment Pr essure Transmitters

ICP 4.11 Accumulator Level Transmitters

ICP 4.14 Boric Acid Control System

ICP 4.17 Volume Control Tank Level Transmitters

!

ICP 4.20 Residual Heat _ Removal Pump Flow

ICP 4.22 Containment Sump Level

ICP 4.29 Analog Rod Position

,!

-3-

.

L

.

.

.

s

'

.

.

b.

Findings

Of the twenty (20) sets of calibration data for the procedures

listed above, five.-(5)' contained as left values outside the

acceptance criteria for the procedure. An additional twenty

(20) sets of calibration data from " Series 4.0" procedures were

examined 'and two (2) more similarLoccurances were noted.

"

,

,.

Noncompliance

Point Beach Nuclear Plant Technical Specification Section 15.6.8.1

states, in part that the plant shall be operated and maintained

in accordance with approved procedures. Major procedures. . .shall be

provided for the following operations where these operations involve

nuclear safety of the plant. -Category No. 7 is surveillance and

testing of' safety related equipment' .

4

10 CFR 50 Appendix B.Section XI states'in part that test results-

shall be documented and evaluated to assure that..the test: require-

i-

ments have been satisfied.

Contrary to the above, the inspector found the following calibra--

-

tions to be-outside_the. test acceptance criteria with no evider.ce

of the technician noting these. conditions and the tests accepted

by the I&C supervisor and.the I&C engineer. Each of these. tests

j

has a section for noting problems and disposition of the problem.

In each case, the area was blank. Discussions with~the-I&C engineer

indicated that he did review results for violating technical

specification limits and conservativeness.

ICP 4.7

Unit I dated December 4, 1980

1FT-476

Feedwater Flow

1FT-477

FI-466

FI-476

ICP 4.11 Unit 2 dated April 18, 1980

2LT-938

(

Accumulator Level

l

ICP 4.14 Unit I dated December 9,1980

F111

Boric Acid Dilution Flow

>

ICP 4.14 Unit 2 dated May 6, 1980

F11L

Boric Acid Dilution Flow

~

ICP 4.19 Unit 2 dated April 17, 1980

LI-920

Refueling Water Storage

i

Tank Level

s

ICP 4.21 Unit I dated December 18, 1980

FM-128

Charging Water Flow

l

ICP 4.22 Unit 2 dated April 18, 1980

LT-4107>

l

Containment Sump "A" Level

-4-

.

.

.'

.

Of particular concern is ICP 4.7 for feedwater flow. Discussions

on the review of this item with the I&C Engineer indicated that it

was conservative from the standpoint of feed flow / steam flow mis-

match, but had not considered understatement of feed flow impact on

the reactor calorimetric calculations. Discussions with the reactor

engineers indicated they had not.been informed of the feedwater. cal-

ibration errors.

(266/81-08-01; 301/81-07-01)

5.

Calibration of Safety Related Coinponents Not Specified by Technical'

Specifications

The inspector reviewed plant calibration records listed below. This

review was performed to determine if specific calibration requirements

have been established; the operating range / accuracy of components were

consistent with applicable Technical Specifications /SAR; the procedures

used to calibrate the components were reviewed and approved as required

by Technical Specifications; the procedures used contained acceptance-

criteria consistent with Technical Specifications /SAR criteria; the

procedures used contained detailed instructions commensurate with the

complexity of the calibration; the technical content of the procedures

would result in satisfacto;y calibration.

a.

Calibration Records Reviewed

ICP 5.18 Rod Speed Control

ICP 5.19 Steam Dump Control

_ _ ,

ICP 5.20 Pressurizer Pressure Control

.

ICP 5.21 Pressurizer Level Control

ICP 6.12 Auxiliary Feedwater

ICP 6.15 Auxiliary Coolant

ICP 6.17 Safety Injection

PT-M-1 Station Batteries

PT-A-1 Emergency Diesel Inspection

PT-R-4 Testing of Safeguard Protective Relaying

b.

Findings

Noncompliance

ICP 6.17 for Unit I dated November 10, 1980 left FIT-930 for_ Chemical

Addition Tank Inlet Flow outside the. test acceptance values without

evidence of evaluation.

This is a further example of the problem described in Subsection 4.b.

6.

Exit Meeting

The exi. meeting was held with those plant personnel indicated by an

asterisk in Paragraph 1 on Friday, March 27, 1981. The findings of

this report were discussed with those present.

The inspector indicated to those present his appreciation of the

caoperation by plant personnel during the conduct of this inspection.

-5-

.