Part 21 Rept Re Containment Penetration Anchor Plates First Reported on 810428 by Gilbert/Commonwealth.Involved Plants Purchased for Facility Only & Not Used on Other Projects
ML19350D599
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 05/08/1981
From: Coleman J
PULLMAN POWER PRODUCTS CORP. (FORMERLY PULLMAN, INC.)
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
REF-PT21-81-421-000 PT21-81-421, PT21-81-421-000, NUDOCS 8105180116
Download: ML19350D599 (2)


Text

_. _ _

A Whee!!brator - Frye Company P. O. Box 3308. Reach Road Wdliamsport. Pennsylvania 17701 Telephone (717) 323 9991

+S Pullman Power Products Telex 841416 cawe em waamsxn V

q p y'W' "

May 8, 1981 United States Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, PA 19406 Attention:

Mr. Boyce H. Grier, Director

Reference:

Containment Penetration Anchor ?le'tes Perry Nuclear Power Plant - Units 1 & 2 Pullman Power Products Job No. 8405 Gentlemen:

By letter dated April 28, 1981 (copy attached) to your office, Gilbert Associates, Inc.,

reported a potential defect as per 10CFR21.

1.s an additional safeguard, a copy was also forwarded to Pullman Power Products to research whether the r.sterials described on GAI Attachment I were directed for use on other projects.

Picase be advised that the caterials involved were purchased specifically.fer the Perry Nuclear Project only and in accordance with Gilbert Specifications.

The material was not used by Pullman Power Products on other projects.

Very truly yours, PUL1}iAN POWER PRODUCTS A Wheelabrator-Frye Company 71 b\\/

,~t.Li,&

obnM.Coleman Contracts Manager 2

JMC:sik CC:

Victor Stello - USNRC, Office of Inspection & Enforcement, Washington, D.C. 20555 (3 copies)

E. F. Gerwin - Pullman Power Froducts Vice President - Quality Assurance Of@lIS

Gilbcl't/CommOMWCDIth engineers and consu!: ants G!lBERT ASSOCIATES. INC, P. O. Box 1G9. Reaing. PA 19603/Tel. 215-775-250), Cab'e Gilasec/Te:et 835 G RECEIVED Ap'ril 28, 1981 GR. nPa. E!!GII!EERING

g. 30 '81

-United States Nuclear Regulatory Commission O Ett O JJ OE Region I O P.S O J'J O 33 631 Park Avenue OsOa O.]

King of Prussia, Pennsylvania O.

O 19406 l0 0

Attention:

Mr. Boyce-H. Grier, Director l

cc?l:0 T 1 i

Re:

Reportable Defect - 10evau Con tainmen t Pene tra tic $hfic.hcr-P4a tes

Dear Mr. Grier:

r'-

This documents a telephone call made to Mr. A.

Finkel, Electrical Section Chief, Region I, at 11:52 A.M. on April 24, 1981.

Name of Individual Who Reported' Mr. N. R. Barker, Vice President and General 'Ianager of the Quality Assurance Division of Gilbert / Commonwealth at the above address.

Facility I'nvolved Perry Nuclear Power Project, Units 1 and 2, being constructed by'the Cleve-land Electric Illuminating Company.

Components Involved Mechanical penetration attachment plates.

See Attachment i tor the specific penetrations involved.

The attachment plates were furni.shed by Pullman Power Products, Williamsport, Pennsylvania.

Nature of Defect / Failure to Comply Anchor and barrier plat's, which attach piping to the Class MC containment e

. p y. _,,enetration sleeves, were not impact tested or normalized (depending on m,~"

~* "" ~', Sec t i on T T I. Sub se c t i on NF.,

s specification, SP-327-4549-00, Rev.

,1 DUPLICATE DOCUMENT (GAI), did not require impact testing 1

ponent support materials, except where Entire document previously I

g.

entered into system under:

F h/Okgg y ANO No. of pages:

[

[

U"

_'"V

..' [] ]

k h'udma h;,w

% texus e.cw w;r,: w.,. _

ut c,m r:.s. Seat.; n r5 vs sr 20S Ent W.ashers A.eu. JactsA ut 59 7H "C00 80 fee 5:-se:, t.. Yo-t. M r1 G em