Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-409/80-13. Response to Item 2 Inadequate.Corrective Actions Should Be Explained
ML19350D498
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 03/05/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
Shared Package
ML19350D500 List:
References
NUDOCS 8104160040
Download: ML19350D498 (2)


See also: IR 05000409/1980013

Text

I~

tic

\\

'

[g* "84 I*g

UNITED ST ATES

9

NUCLEAR REGULATORY COMMISS10N

[

R EGION 111

o

L

f

799 ROOSEVELT ROAD

(

j

=E~ E uv ~. .u,~o,5 a in

....<

m/r

' MAR 5

980

4'

o

Docket No. 50-409

O

f

fl

1

U

LQ f'

{[- ,gE 2 j fggg [g

'

Dairyland Power Cooperative

! --

ATTN:

Mr. F. W. Linder

General Manager

%

Q

2615 East Avenue - South

N%A

,* ' , .

La Crosse, kl 54601

iS

.

Gentlemen:

Thank you for your letter dated January 6, 1981, informing us of the steps

you have taken to correct the noncompliance identified in our letter dated

December 22, 1980 (IE Inspection Report No. 50-409/80-13). Your response to

item 1 of Appendix A of IE Inspection Report No. 50-409/80-13 is acceptable.

Your response to item 2 of the above referenced document does not

adequately resolve the NRC concerns in regard to the low number of tours

being conducted in the contain=ent area by members of plant supervision.

The initial NRC sampling showed that in ten randomly selected shifts that

zero containment tours were conducted by LACBWR Duty Shift Supervisors

(SS), and in eight randomly selected shifts that zero tours were conducted

by the Shift Technical Advisor (STA). In response to your statement in

the January 6, 1981, letter that our findings in this matter were not

sufficiently supported, our Resident Inspectors increased the sampling

size to a 31 day sample (October 1, 1980 to October 31, 1980) with the

following results:

1.

Of 89 shifts, no containment entries were made by the Duty Shift

Supervisor on 76 shifts,

l

Of 67 shifts, no containment entries were made by the Shift

2.

i

Technical Advisor on 61 shif ts (backshif t and week ends per LACBWR

Administrative Control Procedure 2.4).

l

Thus, it continues to be the NRC judgment supported by the site Resident

Inspector's observations of work activities and conditions inside of

containment, that plant management is not performing sufficient tours of

this area to keep appraised of work activities and conditions inside of

containment.

I

Please note that you were not cited for failure to tour the containment

I

area on each shift. You were cited for the failure to perform sufficient

l

tours of the area by plant supervisory personnel, to keep plant management

properly appraised of work activities (personnel performance) and condi-

tions inside of containra t.

This is contrary to your Administrative

.

Control Procedures 2.3 and 2.4.

!

l

l

810.4160040

&

.

.

Dairyland Power Cooperative

-2-

In your response to this letter, please identify your corrective act. ions

to resolve this matter.

k'e will examine your corrective action during a

future inspection.

Your cooperation with us is appreciated.

Sincerely,

RFLO' A

,

w~

R. F. Hej. can, Acting Director

Division of Resident and Project

Inspection

ec:

R. E. Shimshak, Plant

Superintendent

cc w/ltr dtd 1/6/81:

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

John J. Duffy, Chief

Boiler Inspector

Stanley York, Chairman

Public Service Co==ission

.