Forwards IE Insp Repts 50-352/80-21 & 50-353/80-19 on 801204-31 & Notice of Violation
ML19350D403
Person / Time
Site: Limerick  
Issue date: 01/21/1981
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML19350D392 List:
References
NUDOCS 8104150435
Download: ML19350D403 (2)


See also: IR 05000352/1980021

Text

~

,.

.

c,M

4

UNITED STATES

,

. &

NUCLEAR REGULATORY COMMisslON

., e

lgfI)]fj

..Ecion .

.

,

s2 ,ARx AvaNuc

MING OF PRUSSI A. PENNSYLVANI A 19406

g

.....

Docket Nos. 50-352

50-353

Philadelphia Electric Company

ATTN: Mr. John S. Kemper

Vice President

Engineering and Research

2301 Market Street

Philadelphia, Pennsylvania

19101

Gentlemen:

Subject: Combined Inspection 50-352/80-21 and 50-353/80-19

This refers to the routine inspection conducted by Mr. J. P. Durr of this office

on December 4-31, 1980 at Limerick Generating Station, Units 1 and 2, Limerick,

Pennsylvania of activities authorized by NRC License Nos. CPPR-106 and CPPR-107

and to the discussions of our findings held by Mr. Durr with Mr. J. M. Corcoran

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

,

!

inspector, and observations by the inspector.

l

'

Based on the results of this inspection, it appears that certain of your activities

were not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

These items of noncompliance

have been categorized into the levels described in the Federal Register Notice

(45 FR 66754) dated October 7, 1980.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosures will

,

be placed in the NRC's Public Document Room.

If this report contains any information

l

I

that you (or your contractor) believe to be proprietary, it is necessary that

you make a written application within 30 days to this office to withhold such

information from public disclosure. Any such application must be accompanied by

an affidavit executed by the owner of the information, which identifies the

i

document or part sought to be withheld, and which contains a statement of reasons

l

which addresses with specificity the items which will be considered by the

l

Commission as listed in subparagraph (b) (4) of Section 2.790.

The information

!

sought to be withheld shall be incorporated as far as possible into a separate

l

part of the affidavit.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

i

8104150 1

-

-

.

-.

-

.

.

.

Philadelphia Electric Company

2

-

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

bf

8=

-

.

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined Office of Inspection and Enforcement Inspection

Report Number 50-352/80-21 and 50-353/80-19