Text
~
,.
.
c,M
4
UNITED STATES
,
. &
NUCLEAR REGULATORY COMMisslON
., e
lgfI)]fj
..Ecion .
.
,
s2 ,ARx AvaNuc
MING OF PRUSSI A. PENNSYLVANI A 19406
g
.....
Docket Nos. 50-352
50-353
Philadelphia Electric Company
ATTN: Mr. John S. Kemper
Vice President
Engineering and Research
2301 Market Street
Philadelphia, Pennsylvania
19101
Gentlemen:
Subject: Combined Inspection 50-352/80-21 and 50-353/80-19
This refers to the routine inspection conducted by Mr. J. P. Durr of this office
on December 4-31, 1980 at Limerick Generating Station, Units 1 and 2, Limerick,
Pennsylvania of activities authorized by NRC License Nos. CPPR-106 and CPPR-107
and to the discussions of our findings held by Mr. Durr with Mr. J. M. Corcoran
of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
,
!
inspector, and observations by the inspector.
l
'
Based on the results of this inspection, it appears that certain of your activities
were not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
These items of noncompliance
have been categorized into the levels described in the Federal Register Notice
(45 FR 66754) dated October 7, 1980.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosures will
,
be placed in the NRC's Public Document Room.
If this report contains any information
l
I
that you (or your contractor) believe to be proprietary, it is necessary that
you make a written application within 30 days to this office to withhold such
information from public disclosure. Any such application must be accompanied by
an affidavit executed by the owner of the information, which identifies the
i
document or part sought to be withheld, and which contains a statement of reasons
l
which addresses with specificity the items which will be considered by the
l
Commission as listed in subparagraph (b) (4) of Section 2.790.
The information
!
sought to be withheld shall be incorporated as far as possible into a separate
l
part of the affidavit.
If we do not hear from you in this regard within the
specified period, the report will be placed in the Public Document Room.
i
8104150 1
-
-
.
-.
-
.
.
.
Philadelphia Electric Company
2
-
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
bf
8=
-
.
Robert T. Carlson, Chief
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Combined Office of Inspection and Enforcement Inspection
Report Number 50-352/80-21 and 50-353/80-19