ML19350D394

From kanterella
Jump to navigation Jump to search
Forwards LER 81-018/03L-0
Date released: 12/30/2019 Download: ML19350D394


LER 81-018/03L-0:on 810313,Gow Mac 20-250 Dihydrogen Analyzer Failed Calibr During Surveillance Program SP-708. Caused by Defective thermo-conductivity Cell.Cell Replaced & Instrument Calibr & Restored on 810316
ML19350D395
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/07/1981
From: Komara B
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19350D395 (2)
Forwards LER 81-018/03L-0
ML19350D393
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/07/1981
From: Baynard P
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19350D393 (1)