Forwards IE Insp Rept 50-373/81-04 on 810126-27 & 0205-06. No Noncompliance Noted
ML19350D183
Person / Time
Site: LaSalle 
Issue date: 03/06/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19350D184 List:
References
NUDOCS 8104130651
Download: ML19350D183 (2)


See also: IR 05000373/1981004

Text

T(

/

'o

UNITED STATES

E

  • g

NUCLEAR REGULATORY COMMISSION

o

$

N

E

REGION 111

3

'o,

7se ROOSEVELT ROAD

%.....o

GLEN ELLYN. ILLINOIS 80137

gap,

t' Gl

Gbl cm

i

Docket No. 50-373

9

M

A

-I

gO

() C

Commonwealth Edison Company

- %,k, g

887

' 11

-

,

ATTN:

Mr. Cordell Reed

V

'4@ #" \\4

Vice President

'

Post Office Box 767

C

Chicago, IL 60690

-

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. D. E. Miller,

L. J. Hueter, and P. C. Lovendale of this office on January 26-27 and

February 5-6, 1981, of activities at La Salle County Nuclear Station, Unit 1,

authorized by NRC Construction Permit No. CPPR-99 and to the discussion of

our findings with Mr. Schroeder and others of your staff at the conclusion

of the inspection and with Mr. Bishop on February 27, 1981.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncosapliance with NRC requirements were identified during the

course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and thr:

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty-five days of the date of this letter, to

withhold such information from public disclosure. The application must

include a full st3tement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an enclosure

to the application.

810.4130(08l

Q

.

.

.

.

e

s

6

'

Commonwealth Edison Company

-2-

y,s

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

-

6 $ Y&

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

Enclosure:

IE Inspection

Report No. 50-373/81-04

cc w/ enc 1:

J. S. Abel, Director

of Nuclear Licensing

L. J. Burke, Site

Construction Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. H. Holyoak, Station

Superintendent

B. B. Stephenson

'

Project Manager

Central Files

Reproduction Unit NRC 20b

AE0D

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

Dean Hansell, Office of

Assistant Attorney General

l

.-