ML19350D095

From kanterella
Jump to navigation Jump to search
Forwards LER 81-017/03L-0
Date released: 12/30/2019 Download: ML19350D095


LER 81-017/03L-0:on 810309,train 2 Hpi/Low Pressure Injection cross-connect Isolation Valve Dh 63 Would Not Open from Control Room During Quarterly Valve Surveillance Test 5051.13.Caused by Faulty Torque Switch in Valve Operator
ML19350D097
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/07/1981
From: Matheny D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19350D097 (2)
Forwards LER 81-017/03L-0
ML19350D094
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/07/1981
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19350D094 (1)