Informs That Latest Revisions to Facility Are Acceptable. Density Determinations Should Be Made at Least Once Per Shift or Per 1,000 Cubic Yards of Matl Placed,Whichever Is Greater
ML19350D032
Person / Time
Site: Green County Power Authority of the State of New York icon.png
Issue date: 07/20/1977
From: Stepp J
Office of Nuclear Reactor Regulation
To: Kniel K
Office of Nuclear Reactor Regulation
Shared Package
ML19350D033 List:
References
ZECH, NUDOCS 8104130114
Download: ML19350D032 (1)


Text

d' UNiiLD 5f s f ts

[',.

NUCl.E All REGUL ATOllY COMMISSIOfJ f,. k,$ j }

WASulNG T ON, D. C. 20555

)p'l

[.

\\

o h e,

JUL 2 " 077 j

111210iW; Dull FOR:

K. Kniel, Chief Light Water Reactors Branch #2, Di't!

j 17 0!!:

J. C. Stepp, Chief, Geosciences Branch, DSC i

SUBJi'CT:

GEDTEClitlICAL ENGIllEERIt:G REVIEW lli PLAtlT t;A!!E: Greene County fluclear Power Plant l

1,ICEtiSil:G STAGE:

CP j

DOCKET NUllBER: 50-549 Rl:SPONSIBLE BRAtiCil:

1,WR-2, LPlt, S. Iturwell i.

REVIEW STATUS: Complete We have ccmpleted review of the above plant through Supplement 18 and 1

fini the latest revinfons to be satisfactory.

Although the applicant backf111 specifications are acceptable, we need to assure that the j

frerluency of density testing is aderluate.

We, therefore, reconunend that density determinations be made at least once per shif t or per 1000 CY of material placed, whichever is greater.

This conpletes our review of foundation conditions for the Greene County fluclear Power Plant.

1 s

l J.

a rl 'S te

,i:hlet Cedsciences Branch j

Division of Site Safety and I

i

,/ Environmental Analysis j

/ Office of Nucicar Reactor Regulation ec:

R.

lloyd

/

R. DeYoung W. Gannil l

'}

h S. llu tvell p

i V. !!enaroya

.f.

ColIins i

L. lleller

..I.~ Greeves II. Caldwell R. Cunny, COE, UES 1

s&

i P00R BRIGINAL A

-