ML19350D011

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-373/81-03 & 50-374/81-03 on 810127-28.No Noncompliance Noted
ML19350D011
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 02/25/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19350D012 List:
References
NUDOCS 8104130078
Download: ML19350D011 (2)


See also: IR 05000373/1981003

Text

pa aseg%

{

,

UNITED STATES

,

8

"

NUCLEAR REGULATORY COMMISSION

N

REGION lli

8

790 ROOSEVELT ROAD

4

0

g

OLEN ELLYN, ILLINOIS 60137

....a

j

FEB 2 51981

'

,O

A p-

8

%

Docket No. 50-373

'

'

Docket No. 50-374

j

kf)0

I7

,4

3

-

4 [f-

y

Commonwealth Edison Company

'\\

/

ATTN: Mr. Cordell Reed.

Vice President

~ z.

t

s

Post Office Box 767

@

Chicago, IL 60690

__ u

Gentlemen:

,

,

.

This refers to the routine inspection conducted by Mr. C. M. Erb of this

office on January 27 and 28,1981, of activities at' La Salle County

Station, Units 1 and 2 authorized by NRC Construction Permits No. CPPR-99

and No. CPPR-100 and to the discussion of our findings with L. J, Burke

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observations,

,

and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the en-

closed inspection report will be placed in the NRC's Public Document Room,

except as follows.

If this report contains information that you or your

>

contractors believe to be proprietary, you must apply in writing to this

office, within twenty-five days of the date of this letter, to withhold

such information from public disclosure. The application must include a

full statement of the reasons for which the information is considered

praprietary, and should be prepared so that proprietary information iden-

tified in the application is contained in an enclosure to the application.

.

\\-

'

-

8104.130077

Q

-

.

.

,

pr

Commonwealth Edison Company

2-

FEB 2-51981

-

,

.

1

.

.

We will gladly discuss any, questions you have concerning this

inspection.

Sincerely,

4A W.oL

-

C. E. Norelius, Acting Director

-

Division of Engineering and

Technical Inspection

.

Enclosure:

IE Inspection

Reports No. 50373/81-03

.

and No. 50-374/81-03

!

-

cc w/ enc 1:

J. S. Abel, Director

of Nuclear Licensing

L. J. Burke, Site

Construction Superintendent.

T. E Quaka, Quality

Assurance Supervisor

R. H. Holyoak, Station

Superintendent

B. B. Stephenson

Project Manager

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

.

PDR

Local PDR

NSIC

TIC

Dean Hansell, Office of

Assistant Attorney Ge,neral

.

O

PM