AIIlUitif 15.a K'.HI M K-yJHI FRye JE FAlE U1! I - FUJ1 $W t/W PART 21 IDBEIFICATION NO. 9/'394-Co
' CTPANY iWE ~7 /M DmE a= tmER.
Yko /&
m]ET[0. 5~# #3 i
/
/
DTt DISTRIBUTED ORIGI!ML RENRT SU ?LEFENIARf DISTRIBUTION:
PEACTOR (R)
V FUEL CYCE &
SAFEGlMRDS(S)
IE FIES AD/SG AD/FFFBI AD/ROI PEGIONS I,II,III,IV,V PEGIONS I,II,III,IV,V PEGIONS I,II,III,lV,V VB03R BR. R-IV
\\$0]R BR. R-IV VaO3R BR. R-IV L&3 / IPA NG 5715 tbES / FGS SS-395 NPWD3L AEOD NG 7602 LOEB/fPA i,46 5715 g.ES / SG SS-881 hh Otcdvs mas 77r1 AEOD MG 7602 LO3 / PPA FIG 5715 N?NDSI ASLBP E/W 450 AEOD I4G 7602 N?WDST cdedunw mrr6 nn SAD /SP fig-7210A ASLBP E/W 450 -
NRR/DJL CENTP4' FIES 016 CENTPAL FIES 016 ASLEP E/W 450 CBERAL FIES ( CHRON)
CBERAL FILES (OiRJN)
CSERAL FIES 016 PDR CBHPAL FILES SS-395 CBERAL FILES (CHR0fD LPDR PDR PDR TEPA Q
LPDR 9pAi'Ro ygag ma
'ea m
e ACTION:
h
,4 PRELIMINARY EVALUATION OF THE' ATTAC..k g
TES EAD RESPONSIBILITY FOR FOLLOWJP AS SFOWN BELOW:
IE I
NRR]
ifSS _
CTHER EES p
sie4)#0f73
.PEV.8@S:
TENNESSEE VALLEY AUTHORITY u/- 3 pf4(- G e d P
CH ATTANOOG A. TENNES2EE 374o1 e
200 Chestnut Street Tcuer II Merch 30, 1o81 PERD-50-553/81-09 Mr. Ja:es P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Conmission Regien II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303.
Dear Mr. O'Reilly:
PHIPPS BEND NUCLEAR PLANT UNIT 1 - REPORTABLE DEFICIENCY - OMITTED REBAR FROM SHIELD WALL - PBF.D-50-553/81-09 The subject deficiency was initially repcrted to NRC-0IE, Region II, Inspecter Pete Taylcr en February 27, 1951, as NCR P?NP-197. In ccapliance with paragraph 50.55(e) of 10 CFR Part 50, we are enclesing the first interim report on the subject deficiency. We consider 10 CFR Part 21 applicable to this nonconfer=ance. TVA enticipates trans:itting the final report en er before June 1, 1981. If you have any questions, please call Jim Domer at FTS 857-2014.
Very truly youre, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Regulation and Safety
/
Enclosure cc:
Mr. Victor Stello, Director (Enclosure)
Office of Inspection and Enforce =ent U.S. Nuclear Regulatory Commission Washington, DC 20555 An Equal 1ppertunity Employer
E a
ENCL'OS'URE PHIPPS BEND NUCLEAR PLANT. UNIT 1 OMITTED REBAR FROM UNIT 1 SHIELD WALL PBRD-50-553/81-09 REPORT NO. 1 (INTERIM)-
Description of Deficiency Beinforcing bars shown on C. F. Braun drawings Y-010 and Y-013 between Azimuth 105 and 1?50 were omitted'from.the reactor _ shield building.
The design drawings were not consistent between elevations. Design drawing Y-010 shows rebars terminating at an elevation 5'-2", and design drawing Y-013 shows~rebars cadwelded at an elevation of 15'-2".
The apparent cause of thia deficiency was a drawing discrepancy between-design drawings. TVA inspectors, however, did not identify the discrepancy and the rebar was'placed.and inspected in accordance with drawing' Y-010','
Corrective Actions TVA will drill h' oles in the ceactor shield wall and grout in 16'-9"-long splice bars (44 #11AW), 6'-9" below elevation 5'-2".
A rebar verification group has.been instituted to work directly with the construction trade forces during rebar installation'.' This group is structured within the project engineering /ci.vil unit and has the function to guide construction personnel and correct. discrepancies before they become a problem of complex nature or have reached a stage of nonconformance. Verification before final inspection should eliminate errors caused within the rebar, structure. TVA.has notified GE/C. F. Braun of this nonconforming condition and has requested they.
provide steps to be taken to prevent recurrence'of similar drawing errors.