05000313/LER-1981-004-03, /03L-0:on 810227,diesel Fire Pump Battery Bank Surveillance Test Found Not Completed within Grace Period. Caused by Failure to Notify Supervisor That Procedure Could Not Be Completed During Shift

From kanterella
(Redirected from ML19350C210)
Jump to navigation Jump to search
/03L-0:on 810227,diesel Fire Pump Battery Bank Surveillance Test Found Not Completed within Grace Period. Caused by Failure to Notify Supervisor That Procedure Could Not Be Completed During Shift
ML19350C210
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/25/1981
From: Bramlett L
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19350C209 List:
References
LER-81-004-03L-01, LER-81-4-3L-1, NUDOCS 8103310590
Download: ML19350C210 (1)


LER-1981-004, /03L-0:on 810227,diesel Fire Pump Battery Bank Surveillance Test Found Not Completed within Grace Period. Caused by Failure to Notify Supervisor That Procedure Could Not Be Completed During Shift
Event date:
Report date:
3131981004R03 - NRC Website

text

.

6 NRC F ORM 360 U. S. NUCLE AR REGUL ATORY COMMIS$ TON LICENSEE EVENT REPORT EXHIBIT A CONTROL BLOCK: l l l l l l lh (PLE ASE PRINT OR TYPE ALL REQUIREO INFORMATIONI Q l AIR l A; Nl0 l 1 lgl 0 j0 l -l0 l0 l 0l 0l 0 l-l 0 ]O lg l1 l 1l1 l l gl l lg i

7 8 9 LICENSEE CODE 84 it LaCEN5t NuwetR 2%

26 te(tNst

,,,(

JG b7 Cai be CON *T 8

l',3 LL j@l015 p 'l01013 l 113 l@ 0121217l 811 l@l01312151811l@

7 60 69 DOCEET NUMSga 68 69 EVENY D.TE 74 7b HE,OMiD.TI B0 EVENT DESCRIPTION AND PROBA8LE CONSEQUENCES O'a g lDuring a review of a weekly list of procedures, it was discovered that I

lthe Diesel Fire Pump Battery Bank surveillance test was not completed I

r=si to_L.jIwithin the grace period.

The surveillance was immediately performed and_]

lo isi ithe battery bank proved operable.

The following LER's were similar basedI ion failure to complete a surveillance on time: 313/76-19, 76-23, 77-11, i o.

g [77-16, 78-31, 79-29, 79-36.

Reportable per T.S. 6.12.3.2.b.

i Iolu i I I

  • $"t

'^ia' s's'cNe E8,[a ss$e tc cou,o~s =v couc E

I AIB 16 L.Al@ LLj@ Iz 12121 z I ziz l@ Lz.j@ tzj @

",M;',','[

" ' N

I " #

"'l

@,ag...,oIv..,,[..

t 18111

- L-J-10 101 41 W

10 13 i LLJ

[-J d

u

,,_2 n 22 23 24 JG 27 28 2st Jo 31 3J T.E

. o

,L.

7 MET e.OUns sei som Sut.

s Li M.N F. TuRfA hiJ@L2J@ LZ_J@

LI. @

l 010101 of ELJ@

(RJ@ Lz_j@ Iz19l919l@

33 34 JS 36 37 40 el 42 43 de 43 C AUSE DESCRIPTION AND CORRECf1VE ACTIONS h 8 IPersonnel assigned to perform the surveillance test failed to notify theirl m Isupervisor th1t the pr'ocedure could not be completed during the shif t.

i g ISupervisory revi did not occur until after the required completion date.

lIn the futur aupervisors will review assigned procedures before the due,

, 3 i ate.

The " Battery Bank" was demonstrated operable on 2/27/81 by comple,

d

,1.rusAn of the required surveillg/ c%.scoe,,ks.

o.scoviov ersco,,no~ @

i n

rJagg a

si voca -

or rairArus U o

llij@ l 010 b l@l Refuelina I LBJ@l Procedure Review l

$ 5 u

44 ec so

  • J,,,,,,

eggy,,,,

7

. ou~r e, criv.1y @ l t oc, no, o,,,,u,3, @

.eu.sro o, nu.se l

NA l

LZ_]@ LZ_J@l NA t c

,,u.so.~.~'d,,,o,# s - oisc..rlo,. @

a w,e 10 l Ol Ol@[Z_J@l NA l

i 2

=

, sou~e't..ou'. fits oesca,rioN@-

nu..ca 101010l@l NA l.

i =

5,'r ' " s'ck',rh '"" @

[Zj@l NA

~

l i o E.,$. @k's*c.,,,,o,@ '

NRc usE oNLY.

l NA 1 lllllllllt;ll L. S. Bramiett 501/968-2519 NAuE or enE,ARER

,noNE

810 3 31oJ%