ML19350C067

From kanterella
Jump to navigation Jump to search
Forwards LER 81-030/03L-0
Date released: 12/30/2019 Download: ML19350C067


LER 81-030/03L-0:on 810228,full-out Position Indication Not Achieved When Rod 26-39 Was Fully Withdrawn During Normal Operation.Cause Not Determined.Operational Check of Rod Will Be Performed Following Next Unit Startup
ML19350C068
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 03/23/1981
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19350C068 (1)
Forwards LER 81-030/03L-0
ML19350C065
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 03/23/1981
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19350C065 (1)