ML19350C025

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 70-1113/81-02 on 810224-27.No Noncompliance Noted
ML19350C025
Person / Time
Site: 07001113
Issue date: 03/11/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Long J
GENERAL ELECTRIC CO.
Shared Package
ML19350C026 List:
References
NUDOCS 8103240714
Download: ML19350C025 (2)


Text

4>.

ft%q#e',

UNI TED STATES

  1. !y

~' '

NUCLEAR REGULATORY COMMISSION ja;,,7 i

REGION 11 101 MARIETT A sT. N.W. sulTE 3100 o%*v 8

ATLANTA, o EoRo tA 3o3o3 j

MAR 1 11981 p

'/,

General Electric Ccmoany k/

.\\

d ATTN: J. A. Long, General Manager gg8 W

3 p.

Wilmington Manufacturing Dep.

_ g%gISSJr l:/

P. O. Box 780 cy

%$g Wilmington NC 20402 5

Gentlemen:

p

Subject:

Report No. 70-1113/81-02 This refers to the routine safety < inspection conducted by G. P. Coryell of this office on February 24-27, 1981, of activities ' authorized by NRC License No.

SNM-1097 for the Wilmington Manufacturing factitty and to *he discussi:n of our findings held with J. E. Bergman at the conclusion of the ins::ection.

Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-tion report will be placed in the NRC's Public Document Room.

If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include'a full' statement of the re'asons on 'the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you within the, specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss them witn you.

l[y (Y [

Sinc N Acting director Division of Resident and Reactor Project Inspection

Enclosure:

(See Page 2)

P00RORIGINL 810 3 24 0 7d O

o.

MAR 1 11981 General Electric Company 2

Enclosure:

Inspectf on Report No.

70-1113/81-02 s.

w 9

W

.g' g OM l

, [ D' d

l l

i i

l

- - - - - -- -