ML19350B917

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Repts 50-250/80-35 & 50-251/80-33.Corrective Actions Withheld (Ref 10CFR2.790)
ML19350B917
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/03/1981
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19064A220 List:
References
L-81-93, NUDOCS 8103240249
Download: ML19350B917 (1)


Text

8.

e P O 9 0 s 5 291 C0 '.% *t, F L '0152

  • s 1.l

.-.1..

..u..

J d

" ~

FLO9tD A PCnER & L' cwt CC'J? A' u,

March 3, 1981 L-81-93 Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U.S. Nuclear Regulatory Comission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re: Turkey Point Units 3 & 4 Docket Nos. 50-250 and 50-251 Inspection Report Nos. 80-35 and 80-33 Florida Power & Light Company has reviewed the subject inspection report and a response is attached.

The attached information is of a type specified in 10 CFR 2.790(d), therefore we request that it be witheld from public disclosure.

Very truly yours, 7

f

/

Robert E. Uhrig Vice President Advanced Systems & Technology REU/PLP/mbd 1

i Attachment cc: Harold F. Reis, Esquire L

AECPLE,. SEriv tNG D E:2F; 2