Forwards IE Insp Repts 50-327/80-50 & 50-328/80-28 on 801201-24.No Noncompliance Noted
ML19350B898
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/13/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19350B901 List:
References
NUDOCS 8103240140
Download: ML19350B898 (2)


See also: IR 05000327/1980050

Text

t

[

UNITED STATES

p #

o

8'

i,

NUCLEAR REGULATORY COMMISSION

$

E

REGION ll

g

[

101 MARIETTA ST., N.W.. SUITE 3100

ATLANTA, GEORGI A 303o3

'

j'

.....

FEB 1 31981

p

j%

Tennessee Valley Authority

k,

%(

ATTN:

H. G. Parris

8

,

Manager of Power

ogf,

07

500A Chestnut Street Tower II

C 4

4 .?g/S

4

Chattanooga, TN 37401

g7

-

A

-

Gentlemen:

1>

% 48

b

t

Subject: Report Nos.

iLund CF328/80-ffD

D

6

This refers to the routine inspection conducted by S. D. Butler of this office

on December 1-24, 1980, of activities authorized by NRC Operating License No.

DPR-77 and Construction Permit No. CPPR-73 for the Sequoyah facility, and to the

discussion of our findings held with J. M. Ballentine at the conclusion of the

-

,

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinatioris of procedures and representative records, interviews with

personnel, and observations by the inspector.

-

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

,

-.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it f s

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

.

.,

,

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

p.c

-

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

(See Page 2)

810324 o Ho

Q

- - -

e

}

- .

RB 1 0 *et

'

Tennessee Valley Authority

-2-

.

Enclosure:

Inspection Report Nos. 50-327/80-50

and 50-328/80-28

cc w/ enc 1:

G. G. Stack, Project Manager

J. M. Ballentine, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

-,

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

H. J. Green, Division Director

'

e

.

9

r*

4

-

-

...

.

. .

_ .

.

.

1

%

e

.

'

-

_

. . .

.

i

!

4

i

4

i

/

.

'I

> - - ,

,

- - - , - - . -

,,

, . . , .

., ,

. , , , .

_ , , . ,

-

. , , , ,

,