ML19350B898
| ML19350B898 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 02/13/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19350B901 | List: |
| References | |
| NUDOCS 8103240140 | |
| Download: ML19350B898 (2) | |
See also: IR 05000327/1980050
Text
t
[
UNITED STATES
p #
o
8'
i,
NUCLEAR REGULATORY COMMISSION
$
E
REGION ll
g
[
101 MARIETTA ST., N.W.. SUITE 3100
ATLANTA, GEORGI A 303o3
'
j'
.....
FEB 1 31981
p
j%
Tennessee Valley Authority
k,
%(
ATTN:
H. G. Parris
8
,
Manager of Power
ogf,
07
500A Chestnut Street Tower II
C 4
4 .?g/S
4
Chattanooga, TN 37401
g7
-
A
-
Gentlemen:
1>
% 48
b
t
Subject: Report Nos.
iLund CF328/80-ffD
D
6
This refers to the routine inspection conducted by S. D. Butler of this office
on December 1-24, 1980, of activities authorized by NRC Operating License No.
DPR-77 and Construction Permit No. CPPR-73 for the Sequoyah facility, and to the
discussion of our findings held with J. M. Ballentine at the conclusion of the
-
,
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinatioris of procedures and representative records, interviews with
personnel, and observations by the inspector.
- -
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
,
-.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it f s
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
.
.,
,
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
p.c
-
R. C.
ewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosure:
(See Page 2)
810324 o Ho
Q
- - -
e
}
- .
RB 1 0 *et
'
Tennessee Valley Authority
-2-
.
Enclosure:
Inspection Report Nos. 50-327/80-50
and 50-328/80-28
cc w/ enc 1:
G. G. Stack, Project Manager
J. M. Ballentine, Plant
Superintendent
J. F. Cox, Supervisor, Nuclear
Licensing Section
-,
M. J. Burzynski, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
H. J. Green, Division Director
'
e
.
9
r*
4
-
-
...
.
. .
_ .
.
.
1
%
e
.
'
-
_
. . .
.
i
!
4
i
4
i
/
.
'I
> - - ,
,
- - - , - - . -
,,
, . . , .
., ,
. , , , .
_ , , . ,
-
. , , , ,
,