Discusses OL Hearing Scheduling Process.Ser Technical Input Schedule for CY81 & CY82 Encl
ML19350B857
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 03/13/1981
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Lutken D
MISSISSIPPI POWER & LIGHT CO.
References
NUDOCS 8103230887
Download: ML19350B857 (6)


Text

  • -

t MAR 131981 Mr. D. C. Lutken, President Mississippi Power & Light Company Electric B1dg Jackson, Mississippi 39205

Dear Mr. Lutken:

A recent study of the additional time needed to complete the operating license hearing process indicates that a number of plants have the potential for being ready to load fuel from a construction standpoint before the NRC decision on issuance of an operating license is reached.

In order to eliminate or minimize the impact of the licensing and hearing process on current operating license applications, revised NRC staff Safety Evaluation Report (SEA) and Supplemental Safety Evaluation Report (SSER) dates have been established to be used in work load scheduling by the NRC Office of Nuclear Reactor Regulation (NRR). A list of plants showing our current schedules for technical input to the NRR Division of Licensing (DL) for SER and SSERs is enclosed (Enclosure 1).

I am also enclosing a more com-prehensive schedule showing the relationship of these schedules to other important dates in the licensing process (Enclosure 2).

In general, the changes from previous schedules accelerate the due date for all technical input in order to allow time for a more extended hearing process. The Commission currently is examining the details of the hearing process seeking ways to eliminate unnecessary delays without jeopardizing any legitimate interests of the parties affected or the public health and safety. This examination is not yet complete.

In order for the NRR technical staff to meet these accelerated schedules, all infomation concerning your application identified as needed by the NRR staff must be provided by you or your contractors at least two weeks prior to the date indicated for staff technical input to DL.

However, for SER's scheduled to be issued after June 1981, applicants should provide Equipment Qualification (EQ) infomation in accordance with IE Bulletin 79-OlB at least four months prior to the SER issuance date. This request for EQ infomation amends the previous guidance provided in a letter from R. Tedesco, Assistant Director for Licensing dated November 25, 1980. Your personal attention and commitment is needed to make these accelerated schedules possible.

I also request that you arrange to have people, who can represent you and who can resolve any last minute open items, in residence near NRR headquarters in Bethesda during the two weeks immediately preceding the scheduled technical l

input deadlines. Your staff is requested to contact the Licensing Project l

Manager for specific needs related to the review of your application.

l I

T/0323 08Y7

"*

  • N..

I ssw.ry!

l u c cc u m.,c e s eu m e OFFICIAL RICCRO CCFV m ' m-:-

L

1T yif f

f i

~

Mr. D. C. Lutken, President Of course, if infortution concerning your application is not available when needed, the NRC staff will be unable to avoid changing your plant's priority consistent with other scheduled work. Working under the very tight schedule indicated means that a slip will affect not or.ly your SER issuance date but will also delay other scheduled dates in the licensing and hearing process related to y'aur plant, including the decision date.

Thank you for your cooperation in this matter.

I will keep you advised of additional information concerning this request and of any further schedule revisions.

Si ncerely, orienst IIsad W H. R. Dentse Harold R. Denton, Direc'.or Office of Nuclear Reactor Regulation

Enclosures:

As stated Distribution Central Files

{

l r

l NRR:RSBg,E klM i@i66J" EGG HRCftbrF! DU _ in t NRR:FPA5:ADj NRE HkH:U

p l gg. L:D j

,,,.4 ss@sbn:pa o

e

,_.s.n 3/b.81..

3/.'/81

! 3//-Aii.

l3/ $ 1

!3

/81 l

l

M c 77.c m a z = a c c c g.,

..:==..,;,x.

. ~.

m._.

MAR I 3 1981 Mr. J. 7. Mc;aughy cc: Robert B. McGehee, Esc.

Wise, Carter, Child, Steen & Caraway P. O. Box 651 Jackson, Mississippi 39205 Troy B. Conner, Jr., Esq.

Ccnner, Ncore & Corber 1747 Pennsylvania Avenue, N. W.

Washington, D. C.

20006 Mr. Adrian Zaccaria, Project Engineer Grand Gulf Nuclear Station Bechtel Pcwer Corporation Gaithersburg, Maryland 20760 Mr. Alan G. Wagner, Resident Inspector P. O. Box 469 Port Gibson, Mississippi 39150 Mr. N. L. Stampley, Sr. Vice President Engineering, Production & Construction P.O. Box 1640 Jackson, Mississippi 39205 Mr. L. F. Dale Nuclear Project Manager P.O. Box 1640 Jackson, Mississippi 39205 Mr. John Richardson P. O. Box 1640 Jackson, Mississippi 39205

Enclosure.1 Due Dates for Technical Input to SER and SSER Last Tech.

Plant Action Input to DL Susquehanna 1/2 SER 3/23/81 Summer 1 SSER 3/24/81 Sequoyah 2 SSER 4/01/81 San Onofre 2/3 SSER 4/17/81 LaSalle 1/2 SSER 4/30/81 Zimmer 1 SSER 5/01/81 Waterford 3 SER 5/08/81 Comanche Peak SER 5/22/81 Susquehanna 1/2 SSER 5/26/81 Fermi 2 SER 6/10/81 Shoreham 1 SSER 6/10/81 Waterford 3 SSER 7/16/81 Comanche Peak SSER 7/17/81.

Grand' Gulf 1 SER 8/14/81 Fermi 2 SSER 8/14/81 Watts Bar 1/2 SER 9/11/81 Grand Gulf 1 SSEP 10/25/81 Watts Bar 1/2 SScR 11/26/81 w

e 7

--a

~

n

i e

ENCL 0suRE 2 CY 19BT795TPl ANIS Estimated

$E R SSIR lapact

~5t aM~

%fF Start NRC Construc tion

'MRC~ p_letion (2)

(Months)

Technt'a)

Issue ACRS Technical Issue of Decision Com APPE Plant lJiR APPC Input to DL SER (1)

_H_tL Input to DL SSER (1)

Hearing (l) Date (11 Sales 2 12 12 (C)

(C)

None (C)

(C)

None 4/61 4/18/80(C) 4/16/80(C) tasalle 1 8 2 0

0 2/18/8)(C) 3/05/8)(C) 4/09/81 4/30/81 5/15/81 None 5/81 9/81 6/81 San onofre 2 8 3 6

12 (C) 2/06/81(C) 3/12/81 2/19/8I(IMillC) 2/25/81(IMI)(C) 4/I1/81 5/8/81 07/81 4/82 10/81 4/Is/81 Olablo Canyon I & 2 Low Power 11 13 (C)

(C)

None 2/20/81(C) 3/05/8)(C) 05/81 2/82 3/81 1/81 Full Power 12 14 (C)

(C)

None 3/11/81 3/31/81 05/81 3/82 3/81 1/81 McGuire 1 & 2 tow Power 0

0 None None None (C) 1/8)(C) 2/24/8)(H ) 1/23/8 (1) 1/23/81(C) 1/23/8)(C) 2 Full Power 13 13.

(C)

(C)

None 2/28/81 3/20/81 06/81 3/82 1/28/81(c) 1/28/81(C)

Farley 2 low Power 0

0 (C)

(C)

None None None None 10/23/80(I) 10/23/80(C) 10/22/80(C)

Full Power 0

1 None None None 2/19/8t(C) 3/06/8)(C)

None 3/81 3/81 2/81 Shoreham 1 I

5 3/10/81 3/31/81 5/07/81 6/10/81 7/3/81 01/82 10/82 9/82 5/31/R2 Summer 1 8

10 (C) 2/06/81(C) 3/12/81 3/24/81 4/15/81 07/81 6/82 10/81 8/81 Susquehanna 1 & 2 8

17 3/23/81 4/06/81 5/07/81 5/26/81 6/15/81 10/81 11/82 3/82 6/81 Sequoyah 2 1

0 (C)

(C)

None 4/01/81 4/15/81 None 4/30/81 6/81 4/l5/81 Zisoner 1 3

8 (C)

(C)

None 5/01/81 5/29/81 10/81 1/82 4/82 11/81 Waterford 3 3

3.

5/08/81 5/30/81 7/09/81 1/16/81 7/31/81 03/82 1/83 10/82 10/82 Comanche Peak 2

14 5/22/81 6/11/81 7/09/81

[/17/81 8/12/81 03/82 2/83 12/82 12/81 Feral 2 0

0 6/10/81 6/30/81 8/09/81 8/14/81 8/31/81 02/82 11/82 11/82 11/82 Grand Gulf I O

O 8/14/81 9/07/81 10/13/81 10/25/81 11/15/81 None 12/81 7/82 12/81 Watte Bar 18 2 0

1 9/11/81 10/09/81 11/12/81 11/26/81 12/11/81 None 1/82 8/82 11/81 WMP 2 0

0 2/12/82 3/12/82 4/09/82 4/30/82 5/28/82 None 7/82 1/83 7/82 (1)' Based on January 30, 1981 Report to Congress (2) Based on draf t information f rom Of fice of Hanagenei.! and Program Analysis (HPA) dated f(bruary 10, 1981 estept for Waterford J.

i L.._.

1 i

l DISTRIBUTION:

DOCKET FILE PDR LPDR Branch Tile o

to

-D. Eisenhut J. Roe R. Tedesco

/[

Branch Chief 2

i

'/\\

Licensing Assistant 2

'IA8 4g%,,jpgJ gIO8/

t.

P. Wooley 4

H. Thompson

\\

{

H. Herkson RSB/RF te.

8 I&E (-3 )

c 6

ACRS (16)

NSIC RTERRAA ASLB

)

ASLAB M. Service

)

I I

l 1

I i

W y

e I

c l

-.j,_

+.

c

.