Forwards IE Info Notice 81-07, Potential Problem W/Water-Soluble Purge Dam Matls Used During Inert Gas Welding. No Response Required
ML19350B638
Person / Time
Site: Cooper 
Issue date: 03/16/1981
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 8103230170
Download: ML19350B638 (1)


Text

  • [,

v.

UNITED STATES f

NUCLEAR REGULATORY COMMISSION PDR l

REGION Iv LPDR

~%,,,. 8 611 RYAN Pt.AZA ORIVE, SUITE 1000 MC

'=

ARUNGTON. TEXAS 76011 NSIC CENTRAL FILES Docket No.

50-298 March 16, 1981 3

g\\.9 Nebraska Public Power District

/b u

fD #glS' f(( -j ATTN:

J. M. Pflant, Ofrector 4

Licensing & Quality Assurance O c.,,

Post Office Box 499 Lj qf*,w%/ggI A }

Columbus, Nebraska 68601 Gentlemen:

d

<n

>\\

This IE Infomation Notice is provided as an early notificacion of a possibly significant matter.

It is expected that recipients will review the infomation for possible applicability to their facility.

No soecific action or response is requested at this time.

If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions.

If you have questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.

Sincerely,.-

/

m/

i-1 dlL:( <:;, w,-(~. i~W Karl V. Seyfiit

'/

Director

Enclosures:

1.

IE Information Notice No. 81-07 2.

List of Recently Issued IE Information Notices cc:

L. C. Lessor, Suoerintencent Coooer Nuclear Station

ost Office Box 98 Brownville, Nebraska 68321 G108230l%

b m

SSINS No.: 6835 Accession No.:

8011040267 IN 81-07 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCENENT WASHINGTON, D.C. 20555 IE Information Notice No. 81-07 March 16, 1981 Page 1 of 2 POTENTIAL PROBLEM WITH WATER-SOLUBLE PURGE DAM MATERIALS USED DURING INERT GAS WELDING Description of Circumstances:

Recent experiences with water-soluble purge dam materials at several nuclear construction sites have shown the need to develop welding procedures that address tha potential for thermally decomposing the purge dam material during inert gas welding or post-weld heat treatment operations.

Specifically, polyvinyl alcohol film manufactured by Chris-Craft Industries was the purge dam material used at these construction sites.

The decomposition of this purge dam material at elevated temperatures causes the material to lose its solubility in water.

As a result, the purge dam material cannot be completely dissolved during subsequent piping system flushing and cleaning operations.

The failure of this material to completely dissolve could cause significant problems during reactor plant operation.

Specimens of polyvinyl alcohol film were recently obtained from the Mono-Sol Division of Chris-Craft Industries and tested at Franklin Research Center (FRC) to determine, among other things, the threshold temperature at which the material becomes insoluble in water.

Tha results of this test program indicate that (1) the solubility of the purge dam material in water rapidly approagheszeroifthematerialisheatedandheldattemperaturesinexcess of300F;(2)thepurgedammaterialhardensandbecomegdifficulttobreak if subject to tegperatures in the range of 300 F to 400 F, and becomes brittle if heated to 450 F; and (3) purge dam material heated above its threshold temperature is not soluble in commonly used laboratory solvents.

The ir.de-pendent testing laboratory (FRC) therefore concludes that the Mono-Sol poly-vinylalcoholfilmwillnotdissolveduringaqueousflushingofghesystem if the material has been heated to temperatures in excess of 300 F.

Recommended Actions for Holders of Ooerating Licenses and_ Construction Permits:

-It is recommended that all welding operations involving polyvinyl alcohol purge dam materials be governed by procedures that require the material to be located in areas that are sufficiently cemoged from heat so that the temperature of the material does not reach 300 F.

IN 81-07 March 16, 1981 Page 2 of 2 No written response to this information notice is required.

If you require additional information with regard to this subject, please contact the appropriate NRC Regional Office.

4

IE Information Notic a No. 81-07 Mai-b 16, 1981 LISTING OF RECENTLY ISSUED IE INFORMATION NOTICES Information Subject Date Issued To Notice No.

Issued 80-44 Actuation of ECCS in the 12/16/80 All power reactor Recirculation Mode While facilities with an in Hot Shutdown Operating License (OL) or Construction Permit (CP) 80-45 Potential Failure of 12/17/80 All pressurized water BWR Backup Manual Scram reactor facilities with Capability an Operating License (OL)

Construction Permit (CP) 81-01 Possible Failures of 1/16/81 All power reactor facilities General Electric Type with an Operating License HFA Relays (OL) Construction Permit (CP) 81-02 Transportation of 1/23/81 All Radiography licensees Radiography Devices 81-03 Checklist for Licensees 2/12/81 All power reactor Making Notifications of facilities with an Significant Events in Operating License (OL) and Ac ordance with Near-term Applicants 10 CFR Part 50.72 l

81-04 Cracking in Main Steam 2/27/81 All power reactor facilities Lines with an Operating License (OL) or Construction Permit (CP) 81-06 Failure of ITE Model 3/11/81 All power reactor facilities X-600 Circuit Breaker with an Operating License (0L) or Construction Permit (CP) l 81-05 Degraded DC Systam at 3/13/81 All power reactor facilities Palisades with an Operating License (OL) or Construction Permit (CP)

Enclosure

_