Text
l
/
o
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
'
s.,
n
.E
REGION 111
"
8
799 ROOSEVELT ROAD
e%g
,/
GLEN ELLYN. ILUNolS Sw;
- ...*
.
NO I D 19Af
m
~
O)
}!
D
Docket No. 50-461
? , 4 %/ b,.
=1
yO
Illinois Power Company
! . . i
- 1
/flyI
-fj
' %
ATTH: Mr. W. C. Gerstner
i~\\
Executive Vice President
i .-
N
rg
\\%6% g " g
500 South 27th Street
Decatur, IL 62525
Gentlemcm
This refers to the routine inspection conducted by Mr. H. H. Livemore
of this office on January 6 through February 2,1981, of activities at
the Clinton Power Station, Unit I, authorized by NRC Construction Pemit
No. CPPR-137 and to the discussion of our findings with Pe. M. C. Hollon
and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted of
a selective examination of procedures and representative records,
observations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in
noncompliance with KRC requirements, as described in the enclosed
Appendix A, and a written response is required.
In accordance with Section 2 790 of the NRC's " Rules of Practice,"
.,
Part 2, Title 10, Code of Federal Regulations, a copy of this letter,
the enclosures, and your response to this letter will be placed in the
NRC's Public Document Room, except as follows. If the enclosures
contain information that you or your contractors believe to be propri-
etary, you must apply in writing to this office, within twenty-five
days of your receipt of this letter, to withhold such infomation from
public disclosure. The application must include a full statement of
the reasons for which the infomation is considered proprietary, and
should be prepared so that proprietary infomation identified in the
application is contained in an enclosure to the application.
~
-8108230 %
g
-
. . . .
.-.
_ = _ - - -
.
--
.
_ =
-_
. - - . _ - - .
_-
-. -
'
T111nois Power Company
-2-
FEB 1 o ggg,
4].
I
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
.
'
s
~
G. Fiorelli, Chief
Reactor Construction and
,
Engineering Support Branch
j
4
Enclosures:
1.
Appendix A, Notice
i
of Violation
2.
IE Inspection Report
No. W461/81-03
ccw/encls:
Central Files
Reproduction Unit NRC 20b
-
Local PIR
NSIC.
'
Mr. Dean Hansell, Office of
Assistant Attorney General
Mr. Gary N. Wright, Chief
Division of Nuclear Safety
.
i
'
.
!
'
'
.
.
%