ML19350B518

From kanterella
Jump to navigation Jump to search
Advies That SEP Topics VI-7.C (ECCS Single Failure Criterion & Requirements for Locking Out Power to Valves) & VI-7.C.2 (Failure Mode Analysis) Are Correct Except for Integrated Assessment.Amend 6 to DPR-45 Is Duplicative
ML19350B518
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 03/13/1981
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Linder F
DAIRYLAND POWER COOPERATIVE
References
TASK-06-07.C, TASK-06-07.C2, TASK-6-7.C, TASK-RR LSO5-81-03-028, LSO5-81-3-28, NUDOCS 8103200724
Download: ML19350B518 (2)


Text

'

o a

/

'o, UNITED STATES 8"

NUCLEAR REGULATORY COMMISSION

,I WASHINGTON, D. C. 20555

%.... /

March 13, 1981 Docket No. 50-409 LS05-81-03-028 Mr. Frank Linder General Manager Dairyland Power Cooperative 2615 East Avenue South Lacrosse, Wisconsin 54601

Dear Mr. Linder:

SUBJECT:

iEP TOPICS VI-7.C ECCS SINGLE FAILURE CRITERION AND REQUIREMENTS FOR LOCKING OUT POWER TO VALVES AND VI-7.C.2, FAILURE MODE ANALYSIS (LACROSSE)

The staff, as part of our review of the subject topics, has noted the content of Amendment No. 6 to DPR-45 and we have concluded that the subject topics duplicate your previous submittals and our review thereof.

Accordingly, we consider these topics to be conpleted with the exception of publishing the integrated assessment.

Sincerely, w

f ennis M. Crute f

Operating Reactors anch #5 Division of Licensing cc: See next page SEol s

/ /

use (as)

D5a l 7103200f#%

o

~

r v

Mr. Frank Linder March 13, 1981 cc Fritz Schubert, Esquire Director, Standards and Criteria Staff Attorney Division Dairyland Power Cooperative Office of Radiation Programs 2615 East Avenue South (ANR-460)

La Crosse, Wisconsin 54601 U. S. Environmental Protection Agency

0. S. Heistand, Jr., Esquire Washington, D. C.

20460 Morgan, Lewis & Bockius 1800 M Street, N. W.

s Washington, D. C.

20036 U. S. Environmental Protection Agency Mr. R. E. Shimshak Federal Activities Branch La Crosse Boiling Water Reactor Region V Office Dairyland Power Cooperative ATTN: EIS COORDINATOR P. O. Box 135 230 South Dearborn Street Genoa, Wisconsin 54632 Chicago, Illinois 60604 Ms. Anne K. Morse Charles Bechhoefer, Esq., Chairman Coulee Region Energy Coalition Atomic Safety and Licensing Board P. O. Box 1583 U. S. Nuclear Regulatory Comission La Crosse, Wisconsin 54601 Washi.igton, D. C.

20555 La Crosse Public Library Dr. George C. Anderson 800 Main Street Department of Oceanography la Crosse, Wisconsin 54601 University of Washington Seattle, Washington 98195 U. S. Nuclear Regulatory Comission Resident Inspectors Office Mr. Ralph S. Decker Rural Route #1, Box 225 Route 4, Box 1900 Genoa, Wisconsin 54632 Cambridge, Maryland 21613 Town Chairman Dr. Lawrence R. Quarles Town of Genoa Kendal at Longwood, Apt. 51 Route 1 Kenneth Square, Pennsylvania 19348 Genoa, Wisconsin 54632 Thomas S. Moore Chairman, Public Service Comission Atomic Safety and Licensing Appeal Board of Wisconsin U. S. Nuclear Regulatory Comission Hill Farms State Office Building Washington, D. C.

20555 Madison, Wisconsin 53702 Mr. John H. Buck Alan S. Rosenthal, Esq., Chairman Atomic Safety and Licensing Appeal Boart Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Comission U. S. Nuclear Regulatory Comission Washington, D. C. 20555 Washington, D. C.

20555 U. S. Nuclear Regulatory Comission Mr. Frederick Milton Olsen, III Resident Inspectors Office 609 North lith Street Rural Route #1, Box 225 Lacrosse, Wisconsin Genoa, Wisconsin 54632