Requests Info for SER & Supplemental SER Two Wks Prior to SER Date Indicated on Encl Schedule.Requests,Four Months Prior to SER Issuance,Equipment Qualification Info Per IE Bulletin 79-01B,for SERs Scheduled After June 1981
ML19350B509
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/13/1981
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Wyatt J
LOUISIANA POWER & LIGHT CO.
References
IEB-79-01B, IEB-79-1B, NUDOCS 8103200689
Download: ML19350B509 (6)


Text

s s

DISTRIBUTION:

DOCKET FILE PDR LPDR Branch File D. Eisanhut J. Roe R. Tedesco

.,'/.

Branch Chief 9$

3r, Licensing Assistant i[

/

P. Wooley s/

f,)

'g '

II. Thompson V

11. Berkson

' s,,[ 4 0 193/ x 2

)

Ik ACRS (16)

/p 1

NSIC

_ TERRA ~

N.

r~ f'\\

'N I F

.ASLB ASLAB M.

Service 8'1~0 3 a 0 0 bB9 E

p** ""'4 g.

h UNITED STATES s

g, ) n(

j NUCLEAR REGULATORY COMMISSION wasHmG TON, D. C. 20555 8

+,, v /

e...'

MAR 131981 Mr. J. M. Wyatt, President Louisiana Power & Light Company 142 Delaronde Street New Orleans, LA 70174

Dear Mr. Wyatt:

A recent study of the additional time needed to complete the operating license hearing process indicates that a number of plants have the potential for being ready to load fuel from a construction standpoint before the NRC decision on issuance of an operating license is reached.

In order to eliminate or minimize the impact of the licensing and hearing process on current operating license applications, revised NRC staff Safety Evaluation Report (SER) and Supplemental Safety Evaluation Report (SSER) dates have been established to be used in work load scheduling by the NRC Office of Nuclear Reactor Regulation (NRR). A list of plants showing our current schedules for technical input to the NRR Division of Licensing (DL) for SER and SSERs is enclosed (Enclosure 1).

I am also enclosing a more com-prehensive schedule showing the relationship of these schedules to other important dates in the licensing process (Enclosure 2).

In general, the changes from previous schedules accelerate the due date for all technical input in order to allow time for a more extended hearing process. The Commission currently is examining the details of the hearing process seeking ways to eliminate unnecessary delays without jeopardizing any legitimate interests of the parties affected or the public health and safety. This examination is not yet complete.

In order for the NRR technical staff to meet these accelerated schedules, all infomation concerning your application identified as needed by the NRR staff must be provided by you or your contractors at least two weeks prior to the date indicated for staff technical input to DL. However, for SER's scheduled to be issued after June 1981, applicants should provide Equipment Qualification (EQ) information in accordance with IE Bulletin 79-01B at least four months prior to the SER issuance date. This request for EQ information amends the previous guidance provided in a letter from R. Tedesco, Assistant Director for Licensing dated November 25, 1980. Your personal attention and commitment is needed to make these accelerated schedules possible.

I also request that you arrange to have people, who can represent you and who can resolve any last minute open items, in residence near NRR headquarters in Bethesda during the two weeks immediately preceding the scheduled technical input deadlines. Your staff is requested to contact the Licensing Project Manager for specific needs related to the review of your application.

Mr. J. M. Wyatt, President 10 E Of course, if information concerning your application is not available when needed, the NRC staff will be unable to avoid changing your plant's

,nriority consistent with other scheduled work. Working under the very tight schedule iadicated means that a slip will affect not only your SER issuance date but will also delay other scheduled dates in the licensing and hearing process related to your plant, including the decision date.

Thank you for your cooperation in this matter.

I will keep you advised of additional information concerning this request and of any further schedule revi sions.

Sincerely, Nk n

Harold R. Denton, Director Office of Nuclear Reactor Regulation

Enclosures:

As stated

=

Mr. D. L. Aswell Vice President, Power Production Louisiana Power & Light Company 142 Delaronde Street I

New Orleans, Louisiana 70174 cc:

W. Malcolm Stevenson, Esq.

Montce & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 Mr. E. Blake Shaw, Pittman, Potts and Trowbridge 7

1800 M Street, N. W.

Washington, D. C.

20036 Mr. D. B. Lester Production Engineer Louisiana Power & Light Company 142 Delaronde Street New Orleans, Louisiana 70174 Lyman L. Jones, Jr., Esq.

Gillespie & Jones P. O. Box 9216 Metairie, Louisiana 70005

' Luke Fontana, Esq.

Gillespie & Jones 824 Esplanade Avenue New Orleans, Louisiana 70116 Stephen M. Irving, Esq.

One American Place, Suite 1601 Baton Rouge, Louisiana 70825 Louisiana Office of Conservation ATTN: Administrator Nuclear Energy Division P. O. Box 14690 Baton Rouge,' Louisiana 70808, i

t President, Police Jury St. Charles Parrish

.l

., Hahnville, toutstana 70057 U. S. Environmental Protection Agency ATTN: EIS Coordinator Region VI Office 1201-Elm Street First International Building Dallas,~ Texas 75270

+

lf' %.

.. l w

.m_.

1

)

9 a

1 Due Dates for Technical Input to SER and SSER i

last Tech.

Plant Action input to DL i

Susquehanna 1/2 SER 3/23/81 i

Summer l' SSER 3/24/81

' Sequoyah 2 SSER 4/01/81 San Onofre-2/3 SSER 4/17/81 LaSalle 1/2 SSER 4/30/81 Zimmer i SSER 5/01/81 daterford 3 SER 5/08/81 Comanche Peak SER S/22/81 Susquehanna 1/2 SSER 5/26/81 Fermi 2 SER 6/10/81

}

Shoreham 1 SSER 6/10/ 81 Waterford 3 SSER 7/16/81 Comanche Peak SSER 7/17/81 Grand Gulf 1 SER 8/14/81 Fermi 2 SSER 8/14/81 Watts Bar 1/2 SER 9/11/81 Grand Gulf 1-SSER 10/25/81 Watts Bar 1/2 SSER 11/26/81 8

1 I.

1 p

i s

I c

E..

ENCLOSURL 2 a

CY 198A982'FLANis Estloated SER 55tR Impact 7TF

~3Taft Start NRC Construction (Months)

. Technical Issue ACRS Technical Issue of Decision Completion (2)

Plant (RC, APPC Input to OL sta _(1)

_Mte Input to DL 55tR (1)

Mearin9 (1) Date (1)- NC AFIT Sales 2 12-12 (C)

(C) leone (C)

-(C)

None

'l 4/18/80(C) 4/16/80(C)

LaSalle 1 8 2 0

0 2/18/81(C)- 3/05/81(C) 4/09/81 4/30/81 5/15/81 None 5/81 9/81 6/81 San Onofre 2 8 3 6

12 (C) 2/06/81(C) 3/12/81 7/19/81(IMI)(C) 2/25/81(TMI)(C) 4/17/81 5/8/81 07/81 4/82 10/81 4/15/81 4

Diablo Canyon 1 8 2 Low Power 11 13 (C)

(C)

Ilone 2/20/81(C) 3/05/81(C) 05/81 2/82 3/81 1/81 Full Power 12 14 (C)

(C) leone 3/11/81 3/31/81 05/81 3/82 3/81 1/81 McGuire 18 2 Low Power 0

0 None 16one None (C) 1/81(C) 2/24/8)(H ) 1/23/8)(1) 1/23/81(C) 1/21/8110%

2 Full Power

- 13 13 (C)

(C)

None 2/28/81 3/20/81 06/81 3/82 1/28/81(C) 1/28/Rl(C)

Farley 2

. Low Power ~

0 0

(C)

(C)

None None None None 10/23/80(1) 10/23/80(C) 10/22/80(C)

Full Power 0

1 None Nor.4 Ilone 2/19/01(C) 3/06/8)(C)

None 3/81 3/81 7/Rt Shoreh'an I l'

5 3/10/81 3/31/88 5/07/81 6/10/81 F/3/81.

01/R2 10/82 9/82 5/31/R2 Summer 1 8

10 (C) 7/06/81(t) 3/12/81 3/24/81 4/15/81 07/81 6/82 10/81 8/81 Susquehanna 1 8 2 8

17 3/23/81 4/06/81 5/07/81 5/26/81 6/15/81 10/81 11/82 3/R2 6/81 f

Sequoyah 2 1

0 (C)

(C)

None 4/01/81 4/15/81 None 4/30/81 6/81 4/15/HI 21mer 1 3

'8 (C)

(C)

None 5/01/81 5/29/81 10/81 T/82 4/82 11/R1 Waterford 3 3

3 5/08/81 5/30/81 1/09/81 7/16/81 1/31/81 03/82 t/R3 10/82 10/82 Comanche Pealt 2

14

$/22/81 6/11/81 F/09/81 7/11/81 8/12/81 03/82 2/83 12/82 12/R1 Feral 2-0 0

6/10/81 6/30/81 8/09/81 8/14/81 8/31/81 02/82 11/82 11/R2 11/82 Grand Gulf 1 0

0 8/14/81 9/07/81 10/13/81 10/25/81 11/15/88 lbne 12/81 7/87 12/RI Natts 8ar 1 & 2 0

1 9/11/81 10/09/81 11/12/81 11/26/01 12/11/81 None 1/82 8 / 88 2 11/81 WNP 2 0

0 2/12/82 3/12/82 4/09/82 4/30/R2 5/28/82 None 7/82 F/53 7/H2 i

gl) Dased on January 30, 1931 Report to Con 9ress (2) ' based on draf t inforwat ton f rom Of fice of flan 49ement and Progr am Anslys ts (f1PAJ dated Icbruar y 10, 1901 encept for Waterford 3.