p3 EECu
'o,,
UNITED STt.TES NUCLEAR REGULATORY COMMISSION o
h WASHINGTON, D. C. 20555 0.
j
\\p.....f, MAR 131981 Mr. V. C. Summer, President South Carolina Electric & Gas Co.
328 Main Steet (P.O. Box 764)
Columbia, S.C.
29218
Dear Mr. Summer:
A recent study of the additional time needed to complete the operating license hearing process indicates that a number of plants have the potential for being ready to inad fuel from a construction standpoint before the NRC decision on issuance of an operating license is reached.
In order to eliminate or minimize the impact of the licensing and hearing process on current operating license applications, revised NRC staff Safety Evaluation Report (SER) and Supplemental Safety Evaluation Rept.rt (SSER) dates have been established to be used in work load scheduling by the NRC Office of Nuclear Reactor Regulation (NRR). A list of plants showing our current schedules for technical input to the NRR Division of Licensing (DL) for SER and SSERs is enclosed (En osure 1).
I am also enclosing a more com-prehensive schedule showing tt relationship of these schedules to other important dates in the licensit. 'rocess (Enclosure 2).
In general, the changes from previous schedules tierate the due date for all technical input in order to allow time for ore extended hearing process. The Commission currently is examining details of the hearing process seeking ways to eliminate unnecessary dela). 'ithout jeopardizing any legitimate interests of the parties affected or. a public health and safety. This examination is not yet complete.
In order for the NRR technical staff to m; t these accelerated schedules, all infomation concerning your applicatiot 'dentified as needed by the NRR staff must be provided by you or your contre 'rs at least two weeks prior to the date indicated for staff technical inp.
to DL.
However, for SER's scheduled to be issued after June 1981, applicanc tuld provide Equipment Qualification (EQ) information in accordance with IE Bulletin 79-01B at least four months prior to the SER issuance date. This request for EQ infomation amends the previous guidance provided in a letter from R. Tedesco, Assistant Director for Licensing dated November 25,198(s. Your personal attention and commitment is needed to make these accelerated schedules possible.
I also request that you arrange to have people, who can represent you and who can resolve any last minute open items, in residence near NRR headquarters in Bethesda during the two weeks immediately preceding the scheduled technical input deadlines. Your staff-is requested to contact the Licensing Project Manager for specific needs related to the review of your application.
810320 0 #
E
Mr. V. C. Summer, President MAR 13191 8
Of course, if information concerning your application is not available
~
when needed, the NRC staff will be unable to avoid changing your plant's priority consistent with other scheduled work. Working under the very tight schedule indicated means that a slip will affect not only your SER issuance date but will also delay other scheduled dates in the licensing and hearing process related to your plant, including the decision date.
Thank you for your cooperation in this matter.
I will keep you advised of additional information concerning this request and of any further schedule revisions.
Si ncerely,
[
~
Harold R. Denton, Director Office of Nuclear Reactor Regulation Encl osures:
As stated
1 Mr. T. C. Nichols, Jr.
Vice President & Group Executive Nuclear Operations South Carolina Electric & Gas Company P. O. Box 764 Columbia, South Carolina 29218 cc: Mr. William A. Williams, Jr.
Vice President
$ dth Carolina Public Service Authority 223 North Live Oak Drive Moncks Corner, South Carolina 29461 J. B. Knotts, Jr., Esq.
Debevoise & Libennan 1200 17th Street, N. W.
Washington,-D. C.
20036 Mr. Mark B. Whitaker, Jr.
Group Manager - Nuclear Engineering & Licensing South Carolina. Electric & Gas Company P. O. Box 764
'r Columbia, South Carolina 29218
.Mr. Brett Allen Bursey Route 1. Box 93C Little Mountain, South Cerolina 29076
- Resident inspector / Summer NPS c/o U.'S. NRC-Route 1,- Box 64 j.i.,
Jenkinsville, South Carolina 29065-A t
^* ;
9 A
.. ~.
' %l{.
q k.:
').
-.c$Q A.my
.t e
.g
>+ :-
- ,,.M i
'e I/'
..,')
,?
- 5. -
.1 i
Due Dates for Technical input to SER and SSER Last Tech.
Plant Action Input to DL Susquehanna 1/2 SER-3/23/81 Summer.1 SSER 3/24/81 Sequoyah 2 SSER 4/01/81 San Onofre 2/3 SSER 4/17/81 LaSalle 1/2 --
SSER-4/30/81 Zimmer 1_
SSER 5/01/81 Waterford 3 SER 5/08/81 Comanche Peak SER 5/22/81 Susquehanna 1/2 SSER 5/26/81 Fermi 2 SEP 6/10/8
. Shoreham 1 SSER 6/10/81
- Waterford 3
-SSER 7/16/81
- Comanche Peak SSER 7/17/81 Grand Gulf.1 SER 8/14/81
- Fermi 2
- SSER~
8/14/81~
Watts Bar 1/2 SER 9/11/81 Grand Gulf.'1
'SSER-10/25/81 Watts Bar.1/2 SSER 11/26/81
[
t i
s 2
=
\\
[NCLOSURE 2 CY 1981 - 195Z PLANTS
' Estimated SER SSER lupact staff 5tarr Start NRC Construction Plant 5
APPL.
Technical Issue
,ACRS Technical Issue of-Dect st on Completion (2)
(Months)
Input to DL.
SER (1)
Mtg Input to DL SSER (1)
Hearing (1) Date (1) TC APPL
, C)
None 4/81 4/18/80(C) 4/16/80(C)
(
Salem 2
,12 12 (C)
(C)
' None (C)
LaSalle 1 & 2 0
0, 2/18/81(C) 3/05/81(C) 4/09/81 4/30/81 5/15/81 None 5/81 9/81 6/81
. San Onofre 2' 8 3 6
12 (C) 2/06/81(C) 3/12/81 2/19/81(TMI)(C) 2/25/81(TMI)(C) 4/17/81 5/8/81 07/81 4/82 10/81 4/15/81 Diablo Canyon 18 2 Low Power' 11 13 (C)
(C)
None.
2/20/81(C) 3/05/81(C) 05/81 2/82 3/81 1/81 Full Power 12 14 (C)
(C)
None 3/17/81 3/31/81 05/81 3/82 3/81 1/81 McGuire 1 & 2 Low Power 0
0 None None None (C) 1/8)(C) 2/24/81(H ) 1/23/81(1) 1/23/81(C) 1/23/81(c) 2 Full Power-13 13 (C)
(C)
None.
2/28/81 3/20/81 06/81 3/82 1/28/81(C) 1/28/81(C)
Farley 2 Low Power 0
0 (C)
(C)
None None None None 10/23/80(1) 10/23/BCIC) 10/22/80(C)
Full Power-0 1
None None None.
2/19/81(C) 3/06/81(C)
None 3/81 3/81 2/81 Shoreham 1 1
-5 3/10/81 3/31/81 5/07/81 6/10/81 7/3/81 01/82 10/82 9/82 5/31/82 Summer 1-8 10 (C) 2/06/81(C) 3/12/81 3/24/81 4/15/81 07/81 6/82 10/81 8/81 Susquehanna 1 & 2 8
17 3/23/81 4/06/81 5/07/81 5/26/81 6/15/81 10/81 11/82 3/82 6/R1 Sequoyah 2 1
0 (C)
(C)
None 4/01/81 4/15/81 None 4/30/81 6/81 4/15/81 Zimmer 1 3
8 (C)
(C)
None 5/01/81 5/29/81 10/81 7/82 4/82 11/81 Waterford 3 3
3 5/08/81 5/30/81 7/09/81 7/16/81 7/31/81 03/82 1/83 10/82 10/87 Comanche Peak 2
14 5/22/81 6/11/81 7/09/81 7/17/81 8/12/81 03/82 2/83 12/82 12/81 Fernt.2 0
0 6/10/81 6/30/81 8/09/81 8/14!81 8/31/81 02/82 11/82 11/82 11/82 Grand Gulf 1 0
0 8/14/81 9/07/81 10/13/81 10/25/81 11/15/81 None 12/81 7/s?
41 Watts Bar 18 2 0
1 9/11/81 10/09/81 11/12/81 11/26/81 12/11/81 None 1/82 8/92 11/81 WNP 2 0
0 2/12/82 3/12/82 4/09/B2 4/30/82 5/28/82 None 7/82 7/8s 7/82 g1) Based on January 30, 1981 Report to Congiess (2) Based on draft information from Office of !!anagement and Program Analysis (!1PA) dated Februaiy 10, 1911 except for Waterford 3.
DISTRIBUTION:
DOCKET FILE PDR LPDR Branch File O
D. Eisenhut 6
J. Roo R. Tedesco g
U////
d Branch Chief Licensing Assistant
' I 44 O/ggIA )
P. Wooley L;
II. Thompson II. Berkson oy RSB/RF y
I&E (3)
ACRS (16)
$TERRN5f k M M %
ASLB ASLAB M. Service W,