| Issue date: | 03/13/1981 |
| From: | Harold Denton Office of Nuclear Reactor Regulation |
| To: | Brittain P TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| References | |
| IEB-79-01B, IEB-79-1B, NUDOCS 8103200670 | |
| Download: ML19350B501 (6) | |
Text
- .
9 L E(.
o,,
UNITED STATES O
NUCLEAR REGULATORY COMMISSION o
60 "g/ffTV
{
- E wasmuorow. o. c. 20sss
/
MAR 131981 Mr. Perry Brittain, President Texas Utilities Generating Company
~ 2001 Bryan Tower Dallas, Texas 75201
Dear Mr. Brittain:
A'recent study;of the additional' time needed to complete the operating license. hearing process indicates that a number of plants have the potential for being ready to load fuel from a construction standpoint before the NRC decision on issuance of an operating license is reached.
In order to eliminate or minimize the impact of the licensing and hearing process on current operating license-applications, revised NRC staff Safety Evaluation Report (SER) and Supplemental _ Safety Evaluation Report (SSER) dates have been established to be used:in work load scheduling by the NRC Office of
~ Nuclear Reactor Regulation (NRR). A list of plants showing our current schedules for-technical input to the NRR Division of Licensing (DL) for SER and SSERs is enclosed (Enclosure 1).
I am also enclosing a more com-prehensive schedule showing the relationship of the:e schedules to other important dates in the licensing process (Enclosure 2).
In general, the changes from pre,fous schedules accelerate the due date for all technical input in order to allow time for a more extended hearing proceas. The Commission currently is examining the details of the hearing process seeking-ways to eliminate. unnecessary delays without jeopardizing any legitimate interests of the parties affected or the public health and safety. This examination is not.yet complete.
In order for ".he NRR. technical staff to meet these accelerated schedules, all infomation concerning your application-identified as needed by the NRR
{
staff must be provided by-you or your contractors at least two weeks prior to the date' indicated for staff technical input to DL.-
However, for SER's i
scheduled to be issued after June 1981, applicants should provide Equipment-i Qualification (EQ) information in accordance with IE Bulletin 79-01B at'least four. months prior.to the SER issuance date. This request!for EQ infomation j
amends the previous ' guidance provided in a letter from R.' Tedesco, Assistant Director for Licensing dated. November 25, 1980., _Your personal-attention and commitment is needed to make these ~ accelerated schedules 'possible.
l'also request-that you' arrange to have people, who can represent you and who can resolve any last minute _ open items, in residence near NRR headquarters in 7 ethesda during the' twofweeks immediately preceding the scheduled technical B
F input deadlines. Your staff is requested to contact the Licensing Project '
' Manager for specific _ needs_ related to the review of your application.
i
! 0 3103200670 l
o
+ - - - =-
DISTRIBUTION:
DOCKET FILE PDR LPDR Branch File D. Eisenhut J.
Ree R. Tedesco Branch Chief Licensing Assistant P. Wooley II. Thompson 11. Berkson RSB/RF
.I&E (3)
' p/-
ACRS (16)
N S IC _,,,,,
$9BM2:ffr:%
ffj ASLB f *jr A 2 ' />fgl.l g ff ASLAB M.
Service e
, s W
e
\\
a 4
s Mr. Perry Brittain, President MAR 131981 Of course, if information concerning your applica' tion is not available when needed, the NRC staff will be unable to avoid changing your plant's priority consistent with other scheduled work. Working under the very tight schedule indicated means that a slip will affect not only your SER is',uance date but will also delay other scheduled dates in the licensing and hearing process related to your plant, including the decision date.
Thank you for your cooperation in this matter.
I will keep you advised of additional information concerning this request and of any further schedule revi sions.
Sincerely, YYY w
Harold R. Denton, Director Of fice of Nuclear Reactor Regulation
Enclosures:
As stated l
i l
l
o 4
Mr. R. J. Gary Executive Vice President and General Manager Texas Utilities Generating Company 2001 Bryan Tower Dallas, Texas 75201 cc: Nicholas S. Reynolds, Esq.
Mr. Richard L. Fouke Debevoise & Liberman 1200 Seventeenth Street Citizens for Fair Utility Regulation 1668-B Carter Drive Washington, D. C.
20036 Arlidgton, Texas 76010 Spencer C. Relyea, Esq.
Resident Inspector / Comanche Peak Worsham, Forsythe & Sampels Nuclear Power Station 2001 Bryan Tower c/o V. S. Nuclear Regulatory Commission Dallas, Texas 75201 P. O. Box 38 Glen Rose, Texas 76043 Mr. Homer C. Schmidt Manager - Nuclear Services Texas Utilities Services, Inc.
2001 Bryan Tower Dallas, Texas 75201
- U.
Mr. H. R. Rock Gibbs and Hill, Inc.
393 Seventh Avenue New York, New York 10001 Mr. A. T. Parker Westinghouse Electric Corporation P. O. Box 355 Pittsburgh, Pennsylvania 15230
,s
.,h.
_ David J.~Preister Assistant Attorney General Environmental Protection Division
- lI..
P. O. Box 12548, Capitol Station d4. '
' i4p Mrs. Juanita Ellis, President
..i Citizens Association for Sound i
0.,
Energy
'.. P.
- 1426 South Polk
'l Dallas, Texas 75224
- g n.
.M Geoffrey M. Gay, Esq.
I-West Texas Legal Services
- T 100 Main Street (Lawyers Bld
',l[A
.I' Fort Worth,_T_exas 76102 T "g.),' d'T i'
J'
\\l.' '.I
,._.....,----4
- .y 7,..
.w3 f
y,,i.
. 'i '
l. d[ f(, Y $hb9hb$.hN'S*'N '?i'h N $b h*5' b.'. '<.1
?*'
i 7-t
~
+
Due Dates for Technical Input to SER and SSER Last Tech.
Plant Action input to DL Susquehanna 1/2 SER 3/23/81 Summer 1 SSER 3/24/81 Sequoyah 2 SSER 4/01/81 San Onofre 2/3 SSER 4/17/81 LaSalle 1/2 SSER 4/30/81 Zimmer 1 SSER S/01/81 Waterford 3 SER 5/08/81 Comanche Peak SER 5/22/81 Susquehanna 1/2 SSER 5/26/81 Fermi 2 SER 6/10/81 Shoreham 1 SSER.
6/10/81
- Waterford 3 SSER 7/16/81 Comanche Peak SSER 7/17/81
. Grand Gulf 1
- SER-8/14/81 Fermi-2 SSER 8/14/81 Watts Bar 1/2 SER 9/11/81 Grand Gulf 1 SSER 10/25/81 Watts Bar 1/2 SSER 11/26/81 f
c'"
a ENCLOSURE 2 CV 19BT - 1982 PLANTS Estimated SER SSER NRC Construc tion Impac t starr starr Start (Months)..
' Technical Issue ACRS Technical Issue of Deci sion Completion (26
. Plant-
- NRC, APPL' Input to DL SER (1)
Mtg Input to DL SSER (1)
Hearing (1) Date (1)
NRC APPE Salen 2 12 12-(C)
(C)
None (C)
(C)
None 4/81 4/18/80(C) 4/16/80(C)
LaSalle 18 2 0
0 2/18/81(C) 3/05/8)(C) 4/09/81 4/30/81 5/15/81 None 5/81 9/81 6/81 San Onofre 2 8 3 6
_12 (C) 2/06/81(C) 3/12/81-2/19/81(TMI)(c) 2/25/81(TMI)(C) 4/17/81
'5/8/81 07/81 4/82 10/81 4/15/81 Of ahlo Canyon 14 2 Low Power 11 '
13
~(C)
(C)
None 2/20/81(C)
.3/05/81(C) 05/81 2/82 3/81 1/81 Full Power 12 14 (C)
(C)
None 3/17/81 3/31/81 05/81 3/82 3/81 1/81 McGuire 18 2 Low Power 0
0 None None None (C) 1/81(C) 2/24/81(H ) /23/81(I) 1/23/81(C) 1/23/81(C) 2 Full Power 13 13 (C)
(C)
None 2/28/81 3/20/81 06/81 3/82 1/28/8)(C) 1/28/81(C)
Farley 2 None 10/23/80(I) 10/23/80(C) 10/22/80(C)
Low Power 0
0
-(C)~
(C)
None None None Full Power-0 1
None None None 2/19/01(C) 3/06/8)(C)
None 3/81 3/81 2/81 Shoreham 1 1
5 3/10/81 3/31/81 5/07/81 6/10/81 1/3/81 01/82 10/82 9/82 5/31/82
- Summer 1 8
10 (C) 2/06/81(c) 3/12/81 3/24/81 4/15/81 07/81 6/82 10/81 8/81 Susquehanna 18 2 8
17 3/23/81 4/06/81 5/07/81
.5/26/81 6/15/81
-10/81 11/82 3/82 6/81 Sequoyah 2 1-
-0 (C)
(C)
None 4/01/81 4/15/81 None 4/30/81 6/81 4/15/81 21:ener 1 3
8 (C)
(C)
None 5/01/81 5/29/81 10/81 7/82 4/82 11/81 7'31/81 03/82 1/83 10/82 10/82
'Waterford 3 3
3 5/08/81 5/30/81 7/09/81 7/16/81
/
Comanche Peak.
2 14 5/22/81 6/11/81 7/09/81 7/11/81 8/12/81 03/82 2/83 12/82 12/81 Fenni 2
-0 0
'6/10/81' 6/30/81 8/09/81 8/14/81 8/31/81 02/82 11/82 11/82 11/82 Grand Gulf 1 0
0 8/14/91 9/07/81 10/13/81 10/25/81 11/15/81 None 12/81 7/82 12/81 4
Watts Bar 18 2 0
1 9/11/81 10/09/81 11/12/81 11/26/81 12/11/81 None 1/82 8/82 11/81 WNP 2 0
0 2/12/82 3/12/82 4/09/82 4/30/82 5/28/82 None 7/82 1/83 7/82
' (1) Based on January 30, 1931 Peport to Congress (2) Based on draft information from Office of Hanagement and Program Analysis (MPA; dated Febrniry 10. 1931 except for Waterford 3.