Submits Response to Item II.K.3.3 of NRC , Requiring Annual Rept of Challenges to Primary Coolant Sys Safety & Relief Valves.Describes 801217 Challenge Involving Four Relief Valves
ML19350B426
Person / Time
Site: Peach Bottom  
Issue date: 03/13/1981
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 8103200520
Download: ML19350B426 (2)


Text

.

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET

\\

P.O. BOX 8699

(,

1881 1981 PHILADELPHIA. PA.19101 gg

=. = -

sh h

(2ie: e4i soot 4

Se e

<s y

g

/

March 13, 1981 i

Docket Nos. 50-277_

50-278 Mr. Darrell G.

Eisenhut, Director Division of Licensing U.S.

Nuclear Regul6 tory Commission

'4a sh i ng ton, 3C 20555

SUBJECT:

Annual Report of Safety-Relief Valve Challenges

Dear Mr. Eisenhut:

In accordance with requirement II.K.3 3 issued in the May 7, 1980 letter, D. G.

Eisenhut to All Operating Reactor Licensees, the following information is being provided for the Peach Bottom Atomic Power Station.

Item II.K.3.3 requires a)1 licenses to report annually challenges to the primary coolant system safety and relief valves.

'de are interpreting challenges to mean the opening of the main steam safety or relief valves in response to a high reactor pressure condition.

Valve testing history is not included.

The operating history for 1980 is as follows:

1.

Challenges to Safety Valves:

None 2.

Challenges to Relier Valves:

One occassion involving fo ur valves on December 17_,

t980 (Unit 3) A' description of the event follows:

/)oYl s

/[0 g10 s 2 00 5~34 A

=-

O a

Mr. D. G.

Eisenhut Page 2 The Reactor was operating at 100% power and experienced a loss of feedwater transient due to problete.s associated with the condensate demineralizer.

During the transient Reactor level reached the lo-lo level setpoint'and Group I, II & III isolations occurred.

About 10-12 minutes af ter the MSIV's closed reactor pressure reached 1100 psi.

Four relief valves opened on pressure as required (C, D, E & F).

All relief valves successfully closed when-reactor pressure was reduced below setpoint.

Very truly yours, f'

~~/

/.'