ML19350B408
Jump to navigation
Jump to search
| ML19350B408 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 02/24/1981 |
| From: | Finer L AFFILIATION NOT ASSIGNED |
| To: | NRC COMMISSION (OCM) |
| References | |
| ISSUANCES-OL, NUDOCS 8103200471 | |
| Download: ML19350B408 (1) | |
Text
~
c s
~
DOCKET NUMBER P
i wW.y
[
PROD. & UTIL FAc.@.;p1,7f
-)
)
t 8 d)
Q G.:'- MW f c,
(hy8 v.
~
431 Claydon Way Sacramento, California 95825 February 24, 1981 Chainnan U. S. Nuclear Regulatory Commission 1717 H Street, N.W.
Washington, D.C.
20555
Dear Sir:
Diablo Canyon Nuclear Power Plant has met all safety and seismic requirements, including those instituted since Three Mile Island. The plant is needed to provide electrical energy in the crucial years ahead.
We urge the NRC to grant an operating license at the earliest opportunity.
Sincerely, u' M v
Lawrence Finer Concerned Citizen
/pd y7
\\ r I q,b c>
s 4[
Q s
Ap' vc
- % ?j h ?,
g
%QA&
F s j, q,g,'yf 810320 0
\\
r, N