6.
I Docket No.50-15S Docket No. 50-255 Ccasumers Power Company ATTN:
Mr. R..B. DeWitt Vice President Nuclear. Operations 212 West Michigan Avenue Jackson, MI 49201
~
cc w/ encl:
~D. P. Hoffman, Nuclear-
. Licensing Administrator-C..J. Hartman, Plant-
_ Superintendent R. W.. Montross,--. Manager -
Central-Files
?
-AD/ Licensing
=AD/ Operating; Reactors
, AEOD -
Resident-' Inspectors,-RIII PDR-j Local P NSIC T
~
Ronald'Callen~, Michigan >
- Public Service' Commission-
.Myron M.ECherry m
u\\
e e-i ro-i; %,g,"ayp
~"
47,
,N
'8W0s29 DJ3kO
~
~
~
g:-
e
,i
/
%'t, UNITED STATES 8
NUCLEAR REGULATORY COMMISSION
.E REGION 111 q
[
799 ROOSEVELT ROAD g*
GLEN ELLYN, ILLINOIS 60137 March 16, 1981 Gentlemen:
This IE Information Notice No. 31-07 is provided as an early notifi-cation of a possibly significant matter.
It is expected that recipients will review tina information for poasible applicability to their facilities.
No specific action or response is requested at this time.
If further h8C evaluations so indicate, an IE Circular or Bulletin will be issced to reccmmend or request specific licensee actions.
If you have questions regarding this matter, please contact this office.
Sincerely, L
4
['g James G. Keppler U
Director
Enclosure:
IE Information Notice No. 81-07
SSINS No.: 6835 Accession No.:
8011040267 IN 81-07 UNITED STATES D
M[ilC NUCLEAR REGULATORY COMMISSION
- g' 0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 March 16, 1981 IE Inforuation Notice No. 81-07:
POTENTIAL PROBLEM WITH WATER-SOLUBLE PURGE DAM MATERIALS USED DURING INERT GAS WELDING Description of Circumstances:
Recent experiences with water-soluble purge dam materials at several nuclear construction sites have shown the need to develop welding procedures that address the potential for thermally decomposing the purge dam material during inert gas welding or post-weld heat treatment operations.
Specifically, polyvinyl alcohol film manufactured by Chris-Craft Industries was the purge dam material used at these constructiron sites.
The decomposition of this purge dam material at elevated temperctures causes the material to lose its solubility in water.
As a re.; ult, the purge dam material cannot be completely dissolvea during subsequent piping system flushing and cleaning operatirns.
The failure of this material to completely dissolve could cause significant problems during reactor plant operation.
Specimens of polyvinyl alcohol film were recently obtained from the Mono-Sol Division of Chris-Craf t Industries and tested at Franklin Research Center (FRC) to determine, among other things, the threshold temperature at which the material becomes insoluble in water.
The results of this test program indicate that (1) the solubility of the purge dam material in water rapidly approaches zero if the material is heated and. held at temperatures in excess of 300 F; (2).the purge dam material hardens and becomes difficult to break if subject to temperatures in the range of 300 F to 400 F, and becomes l'rittle if heated to 450 F; and (3) purge dam material heated above its threshold temperatire is not soluble in commonly used laboratory solvents. The inde-pendent ' testing laboratory (FRC) therefore concludes that the Mono-Sol poly-vinyl alcohol film will not dissolve during aqueous flushing of the system if the material has been heated to temperatures in excess of 300 F.
Recommended Actions for Holders of Operating Licenses and Construction Permits:
It is recommended that all welding operations involving polyvinyl alcohol purge dam materials be governed by ;srocedures that require the material to be located in areas that are'sufficiently removed from heat so that the temperature of the material does not reach 300 F.
No written response to this information notice is required.
If you require additional information with regard to this subject, please contact the appropriate NRC Regional Office.,
Attachment:
'Recently issued IE Information' Notices e
1 Attachment IN 81-07 March 16, 1981 RECENTLY ISSUED IE INFORMATION NOTICES Information Date of Notice No.
Subject Issue Issued to 81-06 Failure of ITE Model 3/11/81 All power, reactor K-600 Circuit Breaker facilities with an OL or CP 81-05 Degraded DC System at 3/13/81 All power reactor Palisades facilities with an OL or CP 81-04 Cracking in Main Steam 2/27/81 All power reactor Lines facilities with an OL 81-03 Checklist for Licensees 2/12/81 All power reactor Making Notifications of facilities with an Significant Events in OL Accordance with 10 CFR 50.72 81-02 Transportation of 1/23/81 All Radiography Radiography Devices licensees 81-01 Possible Failures of 1/16/81 All power reactor
-General Electric Type facilities with an HFA Relays OL or CP.
80-45 Potential Failure of 12/17/80 All PWR facilities
'BWR Backup Manual Scram with an OL or CP Capability 80-44 Actuation of ECCS in'the 12/16/80 All PWR facilities Recirculation Mode While with an OL or CP in liot Shutdown-80-43.
Failures of the Continuous 12/5/80 All power reactor Water Level Monitor for facilities with an the Scram Discharge Volume OL or CP at.Dresden Unit No. 2' 80-42 Effect of Radiation on 11/24/80
.All power reactor
-Hydraulic. Snubber Fluid.
-0L = Operating Licenses CP = Construction Permits
.