Forwards IE Insp Repts 50-352/80-20 & 50-353/80-18 on 801104-28 & Notice of Violation
ML19350B195
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 12/17/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML19350B183 List:
References
NUDOCS 8103200071
Download: ML19350B195 (2)


See also: IR 05000352/1980020

Text

_.

.

s

-

O

M

%p,

UNITED STATES

[c

NUCLEAR REGULATORY COMMISslON

-'

j

g

nEclON I

e

'g

631 PARK AVENUE

KING OF PRUSSI A, PENNSYLV ANI A,19406

C: " . ;'.

Docket Nos. 50-352

50-353

Philadelphia Electric Company

ATTN: Mr. John S. Kemper

Vice President

Engineering and Research

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Combined Inspection Nos. 50-352/80-20 and 50-353/80-18

This refers to the routine inspection conducted by Mr. J. Durr of this office

',

on November 4-28, 1980, at the Limerick Generating Stations, Unit Nos.1 and

2, at Limerick, Pennsylvania of activities authorized by NRC License Numbers

CPPR-106 and CPPR-107 and to the discussions of our findings held by Mr. J.

Durr with Mr.'M. Corcoran of your staff at the conclusion of the inspection.

Areas examined during this inspection are-described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

- and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Based on the results of this inspection, it appears that certain of your activi-

ties 'were not conducted in full compliance with NRC r6quirements, as set forth

in the Notice'of Violation, enclosed iierewith as Appendix A.

These items of

noncompliance have been categorized into the levels as described in our corre-

spondence to you dated December 31, 1974. This notice is sent tc yea pursuant

to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to

this office, within thirty (30) days of your receipt of this notice, a writter.

statement or explanation in. reply including: '(1) corrective steps which have

b'een taken by you a'nd the results achieved; (2) corrective steps which will be

taken' to avoid further items of noncompliance; and (3) the date when full com-

pliance will be achieved.

In.accordance with Section 2.790 of the NRC's Rules of Practice," Part 2,

.

Title 10, Code of Federal Regulations, a copy of this letter and the enclosures

' will be placcJ in the !!RC's Public Document Room.

If this report contains any

information that 'you_ (cr your contractor) believe to be proprietary, it is

.

necessary that you make c written application within 20 days to this office to

- withhold such information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information, which

.

i81032oADW

L

..

.

-

-

.

,

Philadelphia Electric Company

2

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) af Section 2.790.

The information sought to be withheld shall be incorporated as far as possible

inte a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room..

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

A

k ha {

"

obert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation'

2.

Combined Office of Inspection and Enforcement

'

Inspection Report Nos. 50-352/80-20 and 50-353/80-18

.