ML19350B028
| ML19350B028 | |
| Person / Time | |
|---|---|
| Site: | Hartsville |
| Issue date: | 02/10/1981 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19350B029 | List: |
| References | |
| NUDOCS 8103190180 | |
| Download: ML19350B028 (2) | |
See also: IR 05000518/1981001
Text
k
Sa at g
/
D
UNITED STATES
o
y
NUCLEAR REGULATORY COMMISSION
n
- !
$
REGION 11
"
S
101 MARIETTA ST., N.W., SUITE 3100
O
ATLANTA, GEORGIA 303o3
g
,
FE81519g,
g ! <3
- '
s
'
[,
Np
'.3
Tennessee Valley Authority
Sj#'#gCSj8
ATTN:
H. G. Parris
Manager of Power
/ggI
%f,%g% $
A-
500A Chestnut Street Tower II
Chattanooga, TN 37401
/N
Gentlemen:
)
/
Subject: Report Nos
iM19/812M/81-13a
-521/81_-1 J
This refers to the routine inspection conducted by B. R. Crowley of this office
on January 6-9, 1981, of activities authorized by NRC Construction Permit Nos.
CPPR-150, CPPR-151, CPPR-152 cad CPPR-153 for the Hartsville facility, and to
the discussion of our findings held with R. T. Hathcote at the conclusion of the
inspection.
Areas es amined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the Information is proprietary, and should be prepared so that proprietary
l
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
/
C. E. Muw y, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
(See Page 2)
'810 319 0 go
%
\\\\.
. . .
Tennessee Valley Authority
-2-
FEB1 0 1981
Enclosure:
Inspection Report Nos. 50-518/81-1, 50-519/81-1,
50-520/81-1 and 50-521/81-1
cc w/ encl:
R. T. Hathcote, Project Manager
J. F. Cox. Supervisor, Nuclear
Licensing Section
J. E. Wills, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
H. J. Green, Division Director
,
.
9
1