IE Insp Rept 50-358/81-01 on 810105-30.Noncompliance Noted: Failure to Follow Procedure During Control Rod Drive Hydraulic Preoperational Test
ML19350B014
Person / Time
Site: Zimmer
Issue date: 02/12/1981
From: Daniels F, Gwynn T, Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19350B010 List:
References
50-358-81-01, 50-358-81-1, NUDOCS 8103190082
Download: ML19350B014 (6)


See also: IR 05000358/1981001

Text

.

- -.

._

-

-

_

-.-

t

U.S. NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

s

t

REGION III

Report No. 50-358/81-01

Docket No. 50-358

License No. CPPR-88

Licensee: Cincinnati Gas and Electric Company

139 East 4th Street

Cincinnati, Ohio 45201

Facility Name:

W. H. Zimmer Nuclear Power Station

Inspection At:

W. H. Zimmer, Moscow, Ohio

Inspection Conducte : Jan ry 5-9, 12-16, 19-23, 26-30, 1981

. Inspectors:

.' anYes

J[4[9 /

.P

G ,nn

R/QP/

,

Approved By:

R.

. Warnick, Chief

k/

/

P' jects Section 3

Inspection Summary

Inspection on January 5-9, 12-16, 19-23, 26-30, 1981 (Report No. 50-358/81-011

Areas Inspected:

Routine resident inspection of previously identified items,

IE bulletin followup, plant procedures, operations staff training, preoperational

testing observation, preoperational turnover controls and plant tours. This

inspection involved a total of 158 inspector-hours onsite by the NRC ReFident

Inspectors including 17 inspector-hours onsite during off-shifts.

Results: Of t.he seven areas inspected, six were found satisfactory, and one

noncompliance was identified in the area of preoperational testing observation.

(Violation of 10CFR50, Appendix B, Criterion XI, Test Control, Severity Level V)

,

8108190 M

.

l

.

?

DETAILS

1.

Personnel Contacted

  • J. R. Schott, Station Superintendent
  • P. E. King, Assistant Station Superintendent
  • J. J. Wald, Station Quality Engineer

J. H. Woeste, IC Engineer

A. L. Mosbaugh, Testing Coordinator

M. R. Jonzen, Testing Engineer

and others of the station staff

  • Denotes personnel attending monthly exit meeting.

2.

Licensee Action on Previously Identified Items

Unresolved Item 80-24-01 - Lack of traceability for Engineering Change

Requests (ECR).

The inspector reviewed the latest revision to SU.ACP.13. Processing of

Engineering Change Requests and it now appears that traceability can be

maintained. (Closed)

3.

IE Bulletin Followup

For the IE Bulletins listed below the inspector verified that the written

response was within the time period stated in the bulletin that the

written response included the information required to be reported, that

the written response included adequate corrective action commitments based

on information presentation in the bulletin and the licensee's response,

that-licensee management forwarded copies of the written response to the

appropriate onsite management representatives, that information discussed

in the licensee's written response was accurate, and that corrective action

taken by the licensee was as described in the written resporse.

(Closed)Bulletin 80-24, Prevention of Damage Due to Water Leakage Inside

Containment: The inspector verified there were no open water cooling sys-

.tems inside the containment.

No items of noncompliance or deviations were noted.

4.

Plant Procedures

The inspector reviewed the Wm. H. Zimmer Master Procedures Index of station

administrative and implementing procedures. The requiremerts of Technical Specification 6.8.1 and the recommendations of Regulatory Guide 1.33,

Appendix A were used as the basis for this review. This review is presently.

incomplete and will be the subject of a future inspection report.

No items of noncompliance or deviations were noted.

-2-

-

. . _ .

. . _ _ _

.

_.

_

_

_

_.

'

.

\\

5.

Operations staff Training

The inspectors verified that a documented training program censistent with

<

the FSAR training commitments for principal plant staff, licensed persernel,

non-licensed personnel and the technicians has been e=tablished and that

responsibilities for administering and evaluation or the training progeams

has been assigned.

a.

Material Reviewed

(1) Documents

Wm. H. Zimmer FSAR, Chapter 13.2, Training Program

ANSI N18.1-1971, Selection and Training of Nuclear Power Plant

Personnel

NUREG 0737, Clarification of TMI Action Plan Requirements

10CFR55, Appendix A. Requalification Programs for Licensed Operato-s

of Production and Utilization Facilities

(2)

Training Records

Two Cold License Senior Reactor Operators

Two Cold License Reactor Operators

Two Startup Test Engineers

Two Instrument and Control Technicians

Two QA/QC Technicians

(3) Procedures

TR. SAD.02, Revision 02, Fire Brigade Training Program

TR. SAD.05, Revision 00, Rad!ological Self-Monitoring Training

Program

TR. SAD.10, Revision' 00, Certified Operator Onsite, Experience, Low

Power Testing and BWR Simulator Refresher Training

.TR. SAD.08, Revision 00, Licensed Operator Requalification Prrgram

4) Training Sessions Attended

Shift Technical Advisor . Lecture' on Integrated Plant Operations

Cold Licensed Operators Lecture on Recognizing and Mitigating the

Consequences of Severe Core Damage

b.

Findings

The requirements setforth in NUREG 0737 and 10CFR55, Apperdix A regard-

ing Requalification Training have not -been incorporated, as of yet, .

into the latest revisions of TR. SAD.08 and TR. SAD.10.

This is considered

to be an' unresolved item and will be'followed up ir subsequert inspec+1ons.

(50-358/81-01-01)

.-3-

-

_ ___

.'

6.

Preoperational Turnover Controls

,,

The inspector verified implementation of return to construction (turnback)

activities on the Residual Heat Removal (RH) System per SU.PRP.04, Punch-

list Item completion and Maintenance in Turned Over and Non-Turned Over

Areas. This inspection included a detailed procedure review, interviews

with cognizant personnel, review of turnback logs and files, and veriri-

cation of documentation completeness for selected RH system turnbacks.

a.

Findings

(1) Turnback records and files reviewed appeared to be well kept and

complete.

(2)

Section 3 of form PoJ/-04-2 hat space identified as "QA/QC Documen-

tation Complete" which is no longer required by procedure and

should be deleted. This was discussed with the turnover groue

supervisor who indicated that this deletion would be included in

the next revision of SU.PRP.04.

No items of noncompliance or deviations were noted.

7.

Preoperational Testing Observation

The inspectors observed the performance of Control Rod Drive Hydraulic

Preoperational Test, P0.RD.02, Revision 04.

They attempted to verify

procedural controls were being followed, instruments used te record

acceptanc criteria were properly calibrated, and required orerequisites

were comp .ted.

a.

Material Reviewed

(1)

P0.RD.'02, Revision 04, Control Rod Drive Hydraulic Preoperational

Test

.(2)

IM. SAD.01, Revision 02, Instrument and Control Program

(3). MT. SAD.01, Revision' 05, Control of Measuring and Test Equipment

(4)

SU. ACP.05, Revision' 09, Conduct of Preoperational Tests

(5) CGEE FSAR, Section 14.1.1.2.

b.

Findings

(1)' The following are^ examplas of inadequate testing controls during

'the performance of Preoperational Test P0.RD.02.

-(a)

A' step was added to the procedure between step 7.4.2.5 and

7.4.2.6 without use of a Test-Change Notice.

-4-

_

-

. _ . ---

_

'

.

'l

(b)

A note after step 7.4.2.6, which required that valve IC11-

D001-F107 he lef t closed, was not followed and when per-

forming step 7.4.2.7 water was blown out of the above valve

onto the floor and personnel performing test.

(c)

A note after step 7.4.2 requires the completion of testing

through Section 7.4.1 with the exception of Sections 7.1.2,

7.2.6 and 7.3.1 as a prerequisite, but upon review of "Of fi-

cial Copy" of the Preoperational Test Section 7.4.1 was not

verified as completed and step 7.4.2 was being performed.

Also, step 7.4.1.54 of Section 7.4.1 was not verified as

being completed.

(d)

A recorder (1C11-R611) used for recording the acceptance

criteria of buffer assembly settle time was 9 months past

due for calibration.

As stated before, the above are examples of inadequate testing

controls and are considered to be in violation of 10 CFR SC

. Appendix B, Criterion XI; CG&E FSAR Section 14.1.1.2, which states

in part that all preoperational and initial startup tests will be

conducted in accordance with approved written test procedures,

administrative controls and supporting administrative procedures;

and the implementing administrative control procedure SU.ACP.05.

(50- 358/81-01-02)

8.

Plant Tours

The inspectors conducted frequent plant tours throughout this inspection

. period. The below items were identified and the licensee is taking or

has taken appropriate corrective action.

a..

Excessive amounts of combustible material was found in the RH Heat

Exchanger Rooms.

b.

Scaffolding using.the cable tray in the HP Room for support,

c.

Flange on discharge of Reactor Water Cleanup Pump leaking.

d.

Nitrogen bottles located by the south CRD hydraulic accumulators not

properly supported.

No items of noncomplianee were identified.

s

-5-

'

.

L

' -

9.

Unresolved Items

Unresolved items are matters about which more informatien is required in

order to ascertain whether they are acceptable items, items of noncompli-

ance, or deviations. One unresolved item disclosed during this inspection

is discussed in paragraph 5.b.

10.

Management Interview

The inspector met with licensee representatives (denoted in paragraph 1)

at the conclusion of the inspection on January 30, 1981. The inspector

summarized the scope and findings of the inspection.

.

~

-6-

.

d.