Text
[
b
[ anKec %
o
UNITED STATES
[.'.,*
Q
NUCLEAR REGULATORY COMMISSION
) ,.
g4 7
REGION IV
q..;.(/l
611 RYAN PLAZA DRIVE, SUITE 1000
%
.).id !/
ARUNGTON. TEXAS 760)1
.,,,,
~
'Y
(/
r #
In Reply Refer To:
January 30, 1981
2/ Il'.ub
, )
3
RIV
Docket No. 50-498/Rpt. 80-38
Ch
50 499/RpT. 80-38
i
--
AR 171981171981* =4
"-
Q. "* %n
\\j
S
Houston Lighting and Power Company
'/ "
o,
ATTN: Mr. G. W. Oprea , Jr.
Executive Vice President
Post Office Box 1700
Houston, Texas
-77001
Gentlemen:
This refers to the inspection conducted by Messrs. D. P. Tomlinson and J. I.
Tapia of our staff during the period December 15-18, 1980, of activities
authorized by NRC Construction Pennits No. CPPR-128 and 129 for the South Texas
Project, Units No. I and 2, and to the discussion of our findings with Mr. R. A.
Frazar and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of the inspection, no violations were identified.
We have also examined actions you have taken with regard. to previously identified
inspection findings. The status of these items is identified in paragraph 2 of
the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report.will be placed in the NRC's Public Document Room.
If the
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 25 days
of the date of this letter, requesting that such information be withheld from
public disclosure.
The application must include a full statement of the rnisons
why it is claimed that the information is proprietary. The application should
be prepared so that any proprietary information identified is contained in an
810319op y
.
Houston Lighting and Power Company
2
January 30, 1981
enclosure to the application, since the application withou' the enclosure will
c
also be placed in the Public Document Room.
Ir .ve do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
/
/-
b'
W. C. Sefdic, chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection Report No. 50-498/80-38
50-499/80-38