Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20132C0351996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20132C0491996-10-31031 October 1996 Revised Monthly Operating Rept for Oct 1996 for Point Beach Plant,Unit 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with 05000266/LER-1999-007, :on 990831,cable Tray Fire Stops Do Not Meet App R Exemption Requirements Occurred.Caused by Improper Installation of Approved Plant Mod.New Mod Has Been Initiated to Provide Three H Rated Fire Barrier1999-09-30030 September 1999
- on 990831,cable Tray Fire Stops Do Not Meet App R Exemption Requirements Occurred.Caused by Improper Installation of Approved Plant Mod.New Mod Has Been Initiated to Provide Three H Rated Fire Barrier
ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 05000266/LER-1999-004, :on 990420,fuel Oil Transfer Pump Cable in AFW Pump Room Was Noted Outside App R Design Basis.Caused by Error in Design of New Fuel Oil Transfer Sys.Condition Rept CR 99-1140 Was Initiated1999-09-0202 September 1999
- on 990420,fuel Oil Transfer Pump Cable in AFW Pump Room Was Noted Outside App R Design Basis.Caused by Error in Design of New Fuel Oil Transfer Sys.Condition Rept CR 99-1140 Was Initiated
NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with ML20211A7641999-08-11011 August 1999 Safety Evaluation Supporting Amends 190 & 195 to Licenses DPR-24 & DPR-27,respectively NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with 05000301/LER-1999-003-01, :on 990505,licensee Personnel Discovered That Refueling Interval Surveillance of Emergency Lighting Required by TS 15.4.6.A.3 Was Not Conducted.Cause Unknown. Task Sheet call-ups for Both Procedures Have Been Created1999-05-28028 May 1999
- on 990505,licensee Personnel Discovered That Refueling Interval Surveillance of Emergency Lighting Required by TS 15.4.6.A.3 Was Not Conducted.Cause Unknown. Task Sheet call-ups for Both Procedures Have Been Created
05000266/LER-1999-004, :on 990420,discovered That Fuel Oil Transfer Pump Cable in AFW Pump Room Outside App R Design Basis. Caused by Cable Routing Discrepancy.Fire Rounds Increased & Procedures Being Developed to Facilitate Using G-05 EDG1999-05-20020 May 1999
- on 990420,discovered That Fuel Oil Transfer Pump Cable in AFW Pump Room Outside App R Design Basis. Caused by Cable Routing Discrepancy.Fire Rounds Increased & Procedures Being Developed to Facilitate Using G-05 EDG
05000266/LER-1999-003, :on 990406,TS SR for ECCS & Containment Spray Was Not Fully Implemented.Caused by Conservative Interpretation of Valve Impact.Revised Procedures.With1999-05-0606 May 1999
- on 990406,TS SR for ECCS & Containment Spray Was Not Fully Implemented.Caused by Conservative Interpretation of Valve Impact.Revised Procedures.With
ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20206A5031999-04-23023 April 1999 Safety Evaluation Supporting Amends 189 & 194 to Licenses DPR-24 & DPR-27,respectively 05000301/LER-1999-002-01, :on 990323,discovered That Red Channel of SG Pressure Indication Passes Through Fire Zone.Caused by 1983 Modification Oversight.Twice Per Shift Fire Round Has Been Established for Fire Zone Pending Cable Routing Correction1999-04-16016 April 1999
- on 990323,discovered That Red Channel of SG Pressure Indication Passes Through Fire Zone.Caused by 1983 Modification Oversight.Twice Per Shift Fire Round Has Been Established for Fire Zone Pending Cable Routing Correction
NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with 05000301/LER-1999-001-01, :on 990211,EDG Output Breaker Failed to Remain Closed During Surveillance Testing.Caused by Breaker Control Switch Failing to React Quickly.Modified Closing Circuit for EDG Output1999-03-10010 March 1999
- on 990211,EDG Output Breaker Failed to Remain Closed During Surveillance Testing.Caused by Breaker Control Switch Failing to React Quickly.Modified Closing Circuit for EDG Output
ML20207K2751999-03-0202 March 1999 Safety Evaluation Supporting Amends 188 & 193 to Licenses DPR-24 & DPR-27,respectively ML20207L3471999-03-0202 March 1999 Safety Evaluation Supporting Amends 187 & 192 to Licenses DPR-24 & DPR-27,respectively ML20207D5691999-03-0101 March 1999 Safety Evaluation Supporting Amends 186 & 191 to Licenses DPR-24 & DPR-27,respectively NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20236U7201998-07-21021 July 1998 Safety Evaluation Supporting Amend 190 to License DPR-27 ML20236T1761998-07-17017 July 1998 Safety Evaluation Supporting Amends 185 & 189 to Licenses DPR-24 & DPR-27,respectively 05000266/LER-1998-015, :on 980420,containment Fan Cooler Test Results Were Noted Outside Acceptance Criteria.Cause Is Under Evaluation.Pressure Washing of Air Side of Cooling Coils for All Four Unit 1 CFCs Has Been Completed1998-07-17017 July 1998
- on 980420,containment Fan Cooler Test Results Were Noted Outside Acceptance Criteria.Cause Is Under Evaluation.Pressure Washing of Air Side of Cooling Coils for All Four Unit 1 CFCs Has Been Completed
05000266/LER-1998-019, :on 980615,discovered That Containment Hydrogen Monitors Lacked Environmentally Qualified Coating on Terminal Strips.Caused by Terminal Strips Being Disturbed W/O Subsequent Reapplication of Coating.Replaced Coating1998-07-14014 July 1998
- on 980615,discovered That Containment Hydrogen Monitors Lacked Environmentally Qualified Coating on Terminal Strips.Caused by Terminal Strips Being Disturbed W/O Subsequent Reapplication of Coating.Replaced Coating
ML20236S0161998-07-13013 July 1998 Safety Evaluation Supporting Amends 184 & 188 to Licenses DPR-24 & DPR-27,respectively ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6061998-07-0808 July 1998 Safety Evaluation Granting Request for Relief RR-2-23,from Performing ASME Code,Section XI Volumetric Coverage Requirements for SG nozzle-to-safe End Welds & Associated Safe end-to-pipe Welds During Third 10-yr ISI Interval ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 1999-09-30
[Table view] |
Text
-
OPERATING DATA REPORT DOCIET NO. 50-266 00 DATE March 4, 1981 C
Co COMPLETED BY C. U. FAY w
-3 TELEPHONE 414 277 2811 C3 OPERATING STATUS (pg ggg
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT I
. NOTES
__gg
- 2. REPORTING PERIOD: FEBRUARY 1981
- 3. LICENSED THERMAL P00ER (MUT): 1518.
- 4. NAMEPLATE RAi!NG (GROSS MUE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MUE): 497.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MUE): 519.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MUE): 495.
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO UNICH RESTRICTED, IF ANY (NET MUE):
390.0
- 10. REASONS FOR RESTRICTIONS, (IF ANY): SEtxkKHWMME222 Power restriction is the result of a self-imposed reduction in core average temperature in an attempt to inhibit corrosion of steam generator tubes within the tubesheet crevice.
THIS MONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 672 1,416 90,432
- 12. NUMBER OF HOURS REACTOR UAS CRITICAL 672.0 1,416.0 74,850.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 605.7
- 14. HOURS GENERATOR ON LINE 672.0 1,416.0 72,552.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 764.3
- 16. GROSS THERMAL ENERGY GENERATED (MUH) 815,372 1,691,450 100,529,894
- 17. GROSS ELECTRICAL ENERGY GENERATED (MUH) 264,310 551,020 33,810,740
- 18. NET ELECTRICAL ENERGY GENERATED (MUH) 251,054 523,118 32,190,404
- 19. UNIT SERVICE FACTOR 100.0 100.0 80.2
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0 81.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 75.5 74.6 73.0
- 22. UNIT CAPACITY FACTOR (USING DER NET) 75.2 74.3 71.6
- 23. UNIT FORCED DUTAGE RATE 0.0 0.0 3.2
- 24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, ANb DURATION OF EACH):
Steam generator eddy current inspection June 19,1981, expected to last from two to four weeks.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUID0UN 9
DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPfEMBER 22, 1977
OPERATING DATA REPORT DOCKET NO. 50-301 DATE March 4, 1981 COMPLETED BY C. W. FAY IELEPHONE 414 277 2811 OPI. DATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2
. NOTES
- 2. REPORTING PERIOD: FEBRUARY 1981
- 3. LICENSED THERMAL POWER (MWT): 1518.
- 4. NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MUE): 497.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 519.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):- 495.
- 8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (If ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 472 1,416 75,217
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 67,966.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 186.3
- 14. HOURS GENERATOR ON LINE 672.0 1,416.0 46,714.5
- 15. UNI 7 RESERVE SHUTDOWN HOURS 0.0 0.0 123.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1.000,189 2,123,788 90,913,534
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 340,570 715,770 30,839,620
- 18. NET ELECTRICAL ENERGY GENERATED (MJH) 326,089 685,317 29,348,738
- 19. UNIT SERVICE FACTOR 100.0 100.0 88.7
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0 88.9
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 98.0 97.8 79.5
- 22. UNIT CAPACITY FACTOR (USING DER NET) 97.6 97.4 78.5
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 1.8
- 24. SHUIDOWNS SCHEDULED DVER NEXT 4 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling shutdown April 17, 1981, expected to last approximately five weeks.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DA1ED SEPTEMBER 22, 1977
DOCKET NO.
50-266 UNIT NAME Point Beach Un i t-1 DATE March 4,
1981 COMPLETED BY C.
W.
Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH Feb ru a ry, 1981 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL PO%.'.:R LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
375 11 376 21 374 2
374 12 376 22 374 3
373 13 377 23 374 4
372 14 375 24 373 5
373 15 366 25 371 6
373 16 377 26 373 7
374 17 376 27 373 8
374 18 376 28 372 9
377 19 372 29 10 370 20 373 30 31 AD-28A (1-77)
DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE March 4, 1981 COMPLETED BY C.
W.
Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH Pebruarv. 1981 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
484 11 483 21 491 2
481 12 481 22 490 3
482 13 484 23 490 4
480 14 4 81_
24 492 5
484 15 483 25 489 6
48s 16 485 26 490
'7 484 17 485 27 489 8
470 18 488 28 490 9
483 19 487 29 10 486 20 490 30 31 AD-28A (1-77)
i 1
l i!
a 9
A
(
0D 1-2 N
78 o
8B
)
SF Da te SF co hr ec Ege-de ud e
led Q:s g e a c wc: g u v
~
GFEDCBAR Aegoc" e
.P a
OOAORRMEs tp dp e e a q o h 3 n e g fiu n Eevjo W
U c
R N
e r ir u u n i:
ocgn4t E
I t.
r c n a le tp p m P
T titalem b3A gato4 O
5 isotine R
S (cotronan T
H xnr rgnt L
U p a a Ty c
i M
T lltr eF c
O D
a iaR a
Re N
O iEvie oi en T
W nrDns rl ps H
N
) r it u
oe S
o nr Tr re r
gi ee t
F A
c s
E e
N
(
&t t(
Nv b
D e
i e
oe r
x Lo x
.n u
P p
in p
t a
O l
c l
r W
a e
a y
E i
n i
R n
s n
ogvI c
=t
)
e
)
1 R
g0e' 9
E E
8 D
x 1
U a
C m
T 0oEgnie I
n Ug'e O
3 N
S 432lM e
t C
OAMMh a
tuaao Tu htnnd os eouu:
e rmaa P
all ra C
( t en TO eiS vd EM D
xcc e
LP UO p
r nC EL NC lSa to PE IK acm r
HT TE ir Rr OE T
na ee ND N
m cc E
AN
)
ut ME.O 5
4 ri rv SE Sate ee 4
P 5
(
ox Nhtix n
1 o 0 uh U e io h cA 4
i ri Reoni ec
/
i n 2 l
cb Etnsb t
2 t
6 ei Gs i
i 7
6 t
oft o
7 1'
B 0ffo n
e I
1o rG 2y a
6rD 8
c 1
API 1
h Ltrn S
)
1 a
Eaes U
m R
pt n
e Ear i
Fnru t
it c
lr 1
ey tl,.
l!
i 4
A
(
0D 1-2 N
78 o
8B
)
1 D
SF a
t e
SF co hr ec de a
ud ego led oo 4a<~Oe
~mgua-N GFEDCBAR Mogoc 1
1 ea OOAORRMEs tp dp e e a q o 2
U
- eujo o%
c h e m e g fiu n R
N u
n e r ir u u n i:
2ngveew E
I m
P T
r a n a le tp titalem o >c geo4o O
isotine R
S
(
eotronan T
H xnr rgnt L
U paaTy c
i M
T lltr eF c
O D
a iaR a
Re N
O iEvie oi en T
W nrans rl ps H
N r
it u
oe S
)
o nr Tr re r
gi ee t
F A
c s
E e
N
(
&t t(
Nv b
D e
i e
.o e r
x Lo x
n u
P p
in p
t a
O l
c l
r W
a e
a y
E i
n i
R myo*e voE n
s n
v 1
R e
)
)
9 E
E 8
D x
1 U
a C
m T
uoEgeoce I
n og'o O
N S
432lM e
t C
OAMMh a
tuaao Tu htnnd os eouu:
e rmaa P
all ra C
t en TO (eiS vd EM D
xcc e
LP UO p
r nC EL NC lSa to PE IK acm r
HT TE ir Rr OE T
na ee ND N
m cc E
AN
)
ut MO 5
4 ri E.
rv Sate ee 4
P 5
SE
(
ox Nhtix n
1 o
0 uh U e io h cA 4
i ri Reoni ec
/
1 n
1 cb Etnsb t
2 t
0 ei Gs i
i 7
1 t
oft o
7 F B
0ffo n
- a e
I 1o rG 2 y a
6rD 8
c 1
API 1
h Ltrn S
)
1 a
Eaes U
m R
pt n
e Ear i
T Fnru t
it c
lr 2
ey
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No.
50-266 Unit Name Point Beach Unit 1 Date March 4, 1981 Completed By C.
W.
Fay Telephone 414/277-2811 Unit 1 operated at 390 MWe net throughout the period with one load reduction.
On February 15, 1981, at 0055 hours6.365741e-4 days <br />0.0153 hours <br />9.093915e-5 weeks <br />2.09275e-5 months <br />, Unit 1 power was reduced to 280 MWe for turbine stop valve testing.
Af ter successful completion of turbine stop valve testing, Unit 1 was restored to its previous power level of 390 MWe at 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> that same day.
On January 13, 1981, while reviewing the control room emergency filtration system's annual test results from April of 1980 for a control room habitability study, it was dis-covered that the 1980 annual test was not complete as it did not meet the testing requirements of Technical Specification 15.4.11.
This led to a degraded mode of operation allowed by the Technical Specifications.
The subject system was retested on January 14, 1981, and found to be operating satisfactorily with no degradation of system performance evident.
This occurrence was filed on February 4, 1991, under Licensee Event Report No. 81-002/03L-0.
Safe ty related maintenance for this period included replacement of reactor trip relay 1RT-2A.
At 0825 hours0.00955 days <br />0.229 hours <br />0.00136 weeks <br />3.139125e-4 months <br /> on February 17, 1981, after a successful trip test, reactor trip relay 1RT-2A failed to reset during the performance of ICP 2. 3, Periodic Test of Reactor Protection System Logic.
The relay was replaced at 0955 hours0.0111 days <br />0.265 hours <br />0.00158 weeks <br />3.633775e-4 months <br /> that same day and ICP 2. 3 was completed satisfactorily.
O NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No.
50-301 Unit Name Point Beach Unit 2 Date March 4, 1981 Completed By C.
W.
Fay Telephone 414/277-2811 Unit 2 operated at 495 MWe net throughout the period with one load reduction.
On February 8, 1981, at 0021 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br />, Unit 2 power was reduced to 320 MWe for turbine stop valve testing.
After successful completion of turbine stop valve testing, Unit 2 was restored to its previous power level of 495 MWe at 0448 hours0.00519 days <br />0.124 hours <br />7.407407e-4 weeks <br />1.70464e-4 months <br /> that same day.
No licensee reportable events were filed during this pe riod.
Safety related maintenance over this period included replacement of charging pump 2P2A varidrive unit on February 18, 1981.
e w.