Grants Request for Extension of Time for Completion of Fire Protection Mods to 810319 & 811217.Facility Must Remain Shut Down Through Entire Period.Reactor or Primary Containment Structure Must Not Contain Fuel During Period
ML19350A866
Person / Time
Site: Dresden 
Issue date: 03/06/1981
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Abel J
COMMONWEALTH EDISON CO.
Shared Package
ML19350A867 List:
References
LSO5-81-03-005, LSO5-81-3-5, NUDOCS 8103170250
Download: ML19350A866 (3)


Text

_

i o,,

UNITED STATES

[

g f: f. EAR REGULATORY COMMISSION g

p WASHINGTON, D. C. 20555 C

'*o

  • j March 6, 1981 Docket No. 50-10 LS05-81-03-005 m

e Mr. J. S. Abel f*

7 M R 1 0 198 N

'13 Director of Nuclear Licensing Commonwealth Edison Company U 8. %

Post Office Box 767

%'asD* s/

Chicago, Illinois 60690 N

Dear Mr. Abel-

~

SUBJECT:

EXTENSION FOR COMPLETION OF FIRE PROTECTION MODIFICATIONS -

DRESDEN STATION, UNIT NO. 1 We have completed our review of your letter dated February 17, 1981, which requested an extension for completion of fire protection modifi-cations. A discussion of your request foliews.

You requested an extension of the completion schedule requirements of 10 CFR 50.4S(d) concerning fire protection modifications, which the NRC staff had previously approved for completion prior to startup of Dresden 1 following the current outage (scheduled for June 1986).

In support of your request you stated that:

1.

Dresden 1 will remain shutdown during the entire period.

2.

No fuel is in the reactor or the primary containment structure.

3.

All irradiated fuel is stored in the below-grade spent fuel pool and has not been irradiated in the reactor for at least twenty-seven (27) months.

Based on our review, we conclude that you have shown good cause for extending the completion date for these modifications, and that the public health and safety will not be adversely affected by such exten-sion. Accordingly, pursuant to 10 CFR 50.48(d), the dates for completion of the fire protection modifications at Dresden Unit No. I are hereby extended in accordance with 10 CFR 50.48(c)(1) and (2), to March 19, 1981, and December 17, 1981, and before startup from the current outage for items required under10 CFR 50.48(3) and (4),

i 810317 Y

Mr. J. S. Abel 2-March 6, 1981 4

A copy of the related Notice of Extension, which is being forwarded to the Office of the Federal Register for publication, is enclosed.

Sincerely, Harold R. Denton, Director l

Office of Nuclear Reactor Regulation

Enclosure:

Notice of Extension cc w/ enclosure:

See next page i

l i

>,-,,,,,r.

--.,,_-,y g.g,,

.,_r.--

,--.n.

,,w,

,y,--~

p

,,.v,,,.mr..

,v,v

4 Mr. J. S. Abel Merch 6, 1981 cc w/ enclosure:

Isham, Lincoln & Beale Director, Criteria and Standads Counselors at Law Division One First National Plaza, 42nd Floor Office of Radiation Programs Chicago, Illinois 60603 (ANR-460)

U. S. Environmental Protection Mr. 5. B. Stephenson Agency Plant Superintendent Washington, D.C.

20460 Dresden Nuclear Power Station Rural Route #1 U. S. Environmental Protection Morris, Illinois 60450 Agency Federal Activities Branch U. S. Nuclear Regulatory Commission Region V Office Resident Inspectors Office ATTN: EIS C0ORDINATOR Dresden Station 230 South Dearborn Street RR #1 Chicago, Illinois 60604 Morris, Illinois 60450 Resident Inspector Susan N. Sekuler Dresden Nuclear Power Station Assistant Attorney General c.o U. S. NRC Environmental Control Division Rural Route #1 188 W. Randolph Street Morris Illinois 60450 Suite 2315 Chicago, Illinois 60601 Morris Public Library 604 Liberty Street Morris, Illinois 60451 Chairman Board of Supervisors of Grundy County Grundy County Courthouse Morris, Illinois 60450 Departnent of Public Health ATTN: Chief, Division of Nuclear Safety 535 West Jefferson Springfield, Illinois 62761

~~

.