ML19350A835
| ML19350A835 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 02/10/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML19350A836 | List: |
| References | |
| NUDOCS 8103160954 | |
| Download: ML19350A835 (2) | |
See also: IR 05000348/1980040
Text
f/0
%
/
9'#o ,
UNITED STATES
.
y'
}
NUCLEAR REGULATORY COMMISSION
,
U
.s
REGION 11
f
n
101 MARtETTA sT
N.W., surTE 3100
%/
ATLANTA, GEORGIA Jo3o3
j
.....
FEB 1 0 G!
&m
Alabama Power Company
'
f
ATTN:
R. P. Mcdonald
Sv
g4
g/
'e
Vice President-Nuclear Generation
U db
/' A w
ci %, h '9
/
U 91
P. O. Box 2641
78
I
M
Birmingham, AL 35291
4,c? AQ
7
0
_
Gentlemen:
N
- ' - 5
Report Nos. b 8/gn $ $nd
SUBJECT:
3
This refers to ine routine inspection conducted by W. H. Bradford of this office
on November 3 '!8,
1980, of activities authorized by NRC Operating License Nos.
NPF-2 and NPF-8 for the Farley facility, and to the discussion of our findings
held with W. G. Hairston at the conclusion of the inspecticn.
Areas examinea during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulatioas, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietar*;, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full stateme : of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Docuraent Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.
$.[,
Richar-
c. Lewis, Action Chief
Reactor Operations and Nuclear
Support Branch
Enclosure:
Inspection Report Nos.
50-348/80-40 and 50-364/80-50
h
810 316 09 5 4
i
Alabama Power Company
-2-
cc w/ encl:
K. O. Whitt, Executive Vice Presidet'
F. L. Clayton, Jr., Senior Vice Pres _ dent
H. O. Thrash, Manager-Nuclear Generation
0. D. Kingsley, Jr., Manager, Nuclear Engineering
and Technical Services
J. W. McGowan, Manager-Operations
Quality Assurance
W. G. Hairston, III, Plant Manager
W. C. Petty, Manager-Quality Assurance
(Design and Construction) .
R. E. Hollands, Jr., QA Supervisor