Forwards IE Insp Repts 50-348/80-40 & 50-364/80-50 on 801103-28.No Noncompliance Noted
ML19350A835
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/10/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML19350A836 List:
References
NUDOCS 8103160954
Download: ML19350A835 (2)


See also: IR 05000348/1980040

Text

f/0

%

/

9'#o ,

UNITED STATES

.

y'

}

NUCLEAR REGULATORY COMMISSION

,

U

.s

REGION 11

f

n

101 MARtETTA sT

N.W., surTE 3100

%/

ATLANTA, GEORGIA Jo3o3

j

.....

FEB 1 0 G!

&m

Alabama Power Company

'

f

ATTN:

R. P. Mcdonald

Sv

g4

g/

'e

Vice President-Nuclear Generation

U db

/' A w

ci %, h '9

/

U 91

P. O. Box 2641

78

I

M

Birmingham, AL 35291

4,c? AQ

7

0

_

Gentlemen:

N

  • ' - 5

Report Nos. b 8/gn $ $nd

SUBJECT:

3

This refers to ine routine inspection conducted by W. H. Bradford of this office

on November 3 '!8,

1980, of activities authorized by NRC Operating License Nos.

NPF-2 and NPF-8 for the Farley facility, and to the discussion of our findings

held with W. G. Hairston at the conclusion of the inspecticn.

Areas examinea during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulatioas, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietar*;, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full stateme : of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Docuraent Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

$.[,

Richar-

c. Lewis, Action Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

Inspection Report Nos.

50-348/80-40 and 50-364/80-50

h

810 316 09 5 4

i

Alabama Power Company

-2-

cc w/ encl:

K. O. Whitt, Executive Vice Presidet'

F. L. Clayton, Jr., Senior Vice Pres _ dent

H. O. Thrash, Manager-Nuclear Generation

0. D. Kingsley, Jr., Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Operations

Quality Assurance

W. G. Hairston, III, Plant Manager

W. C. Petty, Manager-Quality Assurance

(Design and Construction) .

R. E. Hollands, Jr., QA Supervisor