Text

-_

'o

UNITED STATES

i

<

8

N

NUCLEAR REGULATORY COMMISSION

'

'

4

E

REGION lli

s

.

k

799 ROOSEVELT ROAD

%.....o

GLEN ELLYN, ILLINOIS Co137

February 9, 1981

4

0)

c

Docket No. 50-346

s

Toledo Edison Company

ff

I

U1

{

8.s.

J g$g7 g 7

ATTN:

Mr. Richard P. Crouse

-

Vice President

Y

Nuclear

%w$g

Edison Plaza

9

/

300 Madison Avenue

Toledo, OH 43652

co

co

Gentlemen:

This refers to the routine inspection conducted by Mr. J. D. Smith of

this office on December 10-12, 1980, and Mr. W. G. Rogers of this office

on December 5, 6, 8-12, 15-19 and 22, 23, 1980, of activities at Davis-Besse

Nuclear Power Station, Unit 1, authorized by NRC Operating License No. NPF-3

and to the discussion of our findings with Mr. T. D. Murray through the

course of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Documant

Room, except as follows. If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty-five days of the date of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the application.

81031609.48

-

- - - .

-

.

-

...

-

_ ..

. .

Toledo Edison Company

-2-

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

,

9

. F. Heishman, Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

IE Inspection

Report No. 50-346/80-34

i

cc w/ enc 1:

T. D. Murray, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

AE0D

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Power

Siting Commission

Helen W. Evans, State of Ohio