Forwards IE Insp Rept 50-370/80-12 on 800812-15 & Notice of Violation
ML19350A581
Person / Time
Site: Mcguire
Issue date: 09/17/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19350A542 List:
References
NUDOCS 8103160522
Download: ML19350A581 (2)


See also: IR 05000370/1980012

Text

.

.

f

p p RCitoq

\\

J

4-

UNITED STATES

P'

  1. 'n

NUCLEAR REGULATORY COMMISSION

$

E

REGION il

e

9 8

e

101 MARIETTA ST., N.W., SulTE 3100

ATLANTA, GEORGIA 3o3o3

  • ..,*

SEP 171980

In Reply Refer To:

RII:1.DZ

50-370/80-12

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspectien conducted by L. D. Zajac of this office on August 12-15,

1980, of activities authorized by NRC Construction Permit No. CPPR-84 for the

McGuire facility, and to the discussion of our findings held with T. E. Touchstone

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within 20 days of your

receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Documen'. Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from_you in this regard within

the specified period, the report will be placed in the Public Document Room.

% 08160

.

.

Duke Power Company

-2-

SEP 11P 1980

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

C. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-370/80-12

cc w/ enc 1:

M. D. McIntosh, Plant Manager

J. C. Rogers, Project Manager