ML19350A581
| ML19350A581 | |
| Person / Time | |
|---|---|
| Site: | Mcguire |
| Issue date: | 09/17/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19350A542 | List: |
| References | |
| NUDOCS 8103160522 | |
| Download: ML19350A581 (2) | |
See also: IR 05000370/1980012
Text
.
.
f
p p RCitoq
\\
J
4-
UNITED STATES
P'
- 'n
NUCLEAR REGULATORY COMMISSION
$
E
REGION il
e
9 8
e
101 MARIETTA ST., N.W., SulTE 3100
ATLANTA, GEORGIA 3o3o3
- ..,*
SEP 171980
In Reply Refer To:
RII:1.DZ
50-370/80-12
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
This refers to the inspectien conducted by L. D. Zajac of this office on August 12-15,
1980, of activities authorized by NRC Construction Permit No. CPPR-84 for the
McGuire facility, and to the discussion of our findings held with T. E. Touchstone
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within 20 days of your
receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Documen'. Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from_you in this regard within
the specified period, the report will be placed in the Public Document Room.
% 08160
.
.
Duke Power Company
-2-
SEP 11P 1980
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
C. E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-370/80-12
cc w/ enc 1:
M. D. McIntosh, Plant Manager
J. C. Rogers, Project Manager
i
.
!