ML19350A530
| ML19350A530 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 03/05/1981 |
| From: | Hines E DETROIT EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, EF2-49-944, NUDOCS 8103160431 | |
| Download: ML19350A530 (1) | |
Text
i EdwarJ Hmes
- 1 s.: e -,
-s : -
C.s t ass t e:e o
Detroit w, i;.iN :::m.
- m. m e gq, March 5 1
EF2-49'64 g[7..,Ulff
! l /*,
fi Regicn III
., '.Al4jy Mr. Ja-es G. Keppler, Director y OISSg,50 u, kaf,tg%
/
U.S. Nuclear Regulatory Cct: mission 799 Roosevait Road M,
Glen Ellyn, Illinois 60137
I
Subject:
Final Report of 10CFR50.55(e) Item cn Core Spray Pu.p Mo Handling Darage(#15).
Dear Mr. Keppler:
This is stimitted as Detroit Edison's final report en the Core Spray Pmp Motor Handling Carage prcblem (reported per 50.55(e) require.~ents).
The problem was originally reported to Mr. H.S. Phillips of the NRC-Region III by Detroit Ediscn's Mr. H.A. Walker, Supervisor-Ccnstruction Quality Assurance en February 23, 1979. It was reported this cutor was dropped on January 30, 1979, while it was being loaded cnto a trailer.
There was possible darage to the upper rain shaft hearing.
General Electric doc =nntation on the repairs of the retor has new been ccrpleted. The motor is presently on site awaiting installation.
If you have questiens concerning this ratter, please contact Mr. H.A.
Walker, Supervisor-Ccnstruction Cuality Assurance.
Very truly yours, EH/ HAW /cp cc: dI. Victor Stello, Jr., Director Office of Inspection and Enforcerent Division of Reactor Inspectica Progrars U.S. Nuc1 car Regulatory Camission Washington, DC 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Ccrmtission Resident Inspectors Office 6450 North Dixie Highway Newport, Michigan 48166 it
(
903160k p/7 3,jp f
m+=*+
4e e =
w
- e. -..
a o
, ca. c o+
g oo o w o
== -..
ey -
7 -
w