ML19350A488
| ML19350A488 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 02/12/1981 |
| From: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| References | |
| NUDOCS 8103160305 | |
| Download: ML19350A488 (1) | |
Text
bcc to DAC:ADM:
CENTRAL FILES
- j,0 UNITED STATES PDR:HQ
[.-
t NUCLEAR REGULATORY COMMISSION LPDR 7 :h
.i 2
. 4 p-/
ME f
REGION IV i' N[8/
.Jg{g 611 RYAN Pt.AZA ORIVE. SulTE 1000
o,
ARLINGTON. TEXAS 76011 STATE February 12, 1981 Docket No.
50-298
- '4 9
Nebraska Public Power District off f
4 ATTN:
J. M. Pilant, Director
(
%O Licensing & Quality Assurance f,q,7 0 j ;gg7 h;!
.g Post Office Box 499 g y,,Qg Columbus, Nebraska 68601 Gentlemen:
b xb 7 c The enclosed IE Information Notice 81-03 provides info...
he form of a checklist that should be of assistance to nuclear power plant ocerating staff personnel responsible for making notifications to NRC of significant events in accordance with 10 CFR 50.72.
Sincerely, PI
,y
' Karl V. Seyfrit'/
Director
Enclosures:
1.
IE Information Notice No. 81-03 2.
List of Recently Issued IE Information Notices cc:
L. C. Lessor, Sucerintendent Coccer Nuclear Station Post Office Sox 98 3rownville, Nebraska 58321 810316
i SSINS No. 6870 Accession No.
8011040260 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D. C.
20555 IE Information Notice No. 81-03 February 12, 1981 Page 1 of 1 CHECKLIST FOR LICENSEES MAKING NOTIFICATIONS OF SIGNIFICANT EVENTS IN ACCORDANCE WITH 10 CFR 50.72 Description of Circumstances:
Significant events reported to the NRC Operations Center receive prompt evalua-tion by NRC technical staff.
To assure that adequate information is obtained for evaluation, in an expedient manner, checklists have been developed for the various types of events and are currently in use by the duty officers manning the NRC Operations Center.
In an effort to communicate to licensees the most useful types of information needed depending on the event, a combined checklist has been developed and is attached to this Information Notice.
We recognize that this list is neither all inclusive, nor are all of its sections applicable to each event.
Rather, it is an attempt to list certain key data elements that, based on past experience, appear to suffice for the vast majority of notifications.
Having this type of information available at the time of notification, or shortly thereafter, will serve to expedite the notification and evaluation process and make it more efficient.
It is not intended that licensees complete the checklist prior to, or as a condition of, making a notification.
Instead, the list is intended to inform licensees of the types of information about events that have been useful to the NRC.
We solicit your cooperation in obtaining any other information that may aid NRC in understanding the event and request that you volunteer such informa-tion where appropriate.
Recommendation to Licensees:
This Information Notice is provided for general information to licensees.
Recipients should review the information for applicability to their facilities.
No specific action or response is requested at this time.
If you have any questions regarding this matter, please contact the Director of the appropriate NE: Regional Office.
Attacnment:
Checklist
1 IN 81-03 CHECKLIST FOR NOTIFICATION OF SIGNIFICANT EVENTS MADE IN ACCORDANCE WITH 10 CFR 50.72 A.
Identification:
Date Time Name of Person Making Report Licensee Facility Affected Applicable Part of 10 CFR 50.72 l
B.
==
Description:==
Date of Event Time Description of What Happened C.
Consequences of Event: (Complete depending on type of event)
Injuries Fatalities Contamination (personnel)
(property)
Overexposures (known/possible)
Safety Hazard (describe - actual / potential)
Offsite Radiation Levels Integrated Dose Location Meterology (wind speed)
From (direction)
Weather Conditions (rain, clear, overcast, temperature)
Equipment / Property Damage D.
Cause of Event:
. E.
Licensee Actions:
Taken Planned Emergency Plan Activated (Yes/No)
Classification of Emergency 1/
Resident Inspector Notified (Yes/No)
State Notified (Yes/No)
Press Release Planned (Yes/No)
News Media Interest (Yes/No)
Local / National F.
Current Status: (Complete depending on type of event) 1.
Reactor Systems Status Power Level Before Event After Event, Pressure Temp. (thot)
(tcold)
RCS Flow (Yes/No)
Pumps On (Yes/No)
Heat Sink:
Condenser Steam Atm. Dump Other Sample Taken (Yes/No)
Activity Level ECCS Operating (Yes/No)
ESF Actuation (Yes/No)
PZR or RX Level Possible Fuel Damage (Yes/No)
S/G Levels Feedwater Source / Flow Containment Pressure Safety Relief Valve Actuation (Yes/No)
Containment Water Level Indication Equipment Failures 1
See Emerger,:y Action Levels, Appendix 1, NUREG-0654, Revision 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.
1 Normal Offsite Power Available (Yes/No)
Major Busses / Loads Lost Safeguards Busses Power Source D/G Running (Yes/No)
Loaded (Yes/tM) 2.
Radioactivity Release Liquid / Gas Location / Source Release Rate Duration Stopped (Yes/No)
Release Monitored (Yes/No)
Amount of Release Tech Spec. Limits Radiation Levels in Plant Areas Evacuated 3.
Security /SafeguardsS/
Bomb Threat:
Search Conducted (Yes/No)
Search Results Site Evacuated (Yes/No)
Intrusion:
Insider Outsider Point of Intrusion Extent of Intrusion Apparent Purpose Strike / Demonstrations:
Size of Group Purpose Sabotage:
Radiological (Yes/No)
Arson (Yes/No)
Equipment / Property Extortion:
Source (phone, letter, etc.)
Location of Letter Demands General:
Firearms involved (Yes/No)
Violence (Yes/No)
S See 10 CFR 73.71(c), effective April 6, 1981.
.=_ -__
. Control of Facility Coinpromised or Threatened (Yes/No)
Stolen / Missing Material Agencies Notified (FBI, State Police, Local Police, etc.)
Media Interest (present, anticipated) i
-l f
1 J
e-I
---,o
i l
IE Information Notice No. 81-03 February 12, 1981 LISTING OF RECENTLY ISSUED IE INFORMATION NOTICES Information Subject Date Issued To Notice No.
Issued 80-41 Failure of Swing Check 11/10/80 All power reactor Valve in the Decay Heat facilities with an Operating Removal System at Davis-License (0L) c-Construction Besse Unit No. 1 Permit (CP) 80-42 Effect of Radiation 11/24/80 All power reactor on Hydraulic Snubber Fluid facilities with an Operating License (0L) or Construction Permit (CP) 80-43 Failures of the Continuous 12/5/80 All power reactor Water Leve. Monitor for facilities with an the Scram Discharge Volume Operating License (0L) at Dresden Unit No. 2 or Construction Permit (CP) 80-44 Actuation of ECCS in the 12/16/80 All power reactor Recirculation Mode While facilities with an in Hot Shutdown Operating License (0L) or Construction Permit (CP) 80-45 Potential Failure of 12/17/80 All pressurized water BWR Backup Manual Scram reactor facilities with Capability an Operating License (0L)
Construction Permit (CP) 81-01 Possible Failures of 1/16/81 All power reactor facilities General Electric Type with an Operating License HFA Relays (OL) Construction Permit (CP) 81-02 Transportation of 1/23/81 All Radiography licensees Radiography Devices Enclosure