ML19350A315

From kanterella
Jump to navigation Jump to search
Forwards LER 81-009/03L-0
Date released: 12/30/2019 Download: ML19350A315


LER 81-009/03L-0:on 810212,reactor Coolant Not Analyzed Once Per 24-h as Required by Tech Spec.Caused by Reactor Vessel Hydro During Time Period When Next Conductivity Measurement Was to Be Taken
ML19350A316
Person / Time
Site: Hatch 
Issue date: 03/05/1981
From: Rogers W
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19350A316 (2)
Forwards LER 81-009/03L-0
ML19350A314
Person / Time
Site: Hatch 
Issue date: 03/05/1981
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19350A314 (1)