ML19348A030
| ML19348A030 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 04/07/1981 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML19348A031 | List: |
| References | |
| NUDOCS 8105280289 | |
| Download: ML19348A030 (2) | |
See also: IR 05000245/1980025
Text
ff.e
f *E o
o
UNITED STATES
g
8
NUCLEAR REGULATORY COMMISSION
<>
t;
.
E
REGION I
Q, [* @_[p #
831 PARK AVENUE
8
%
KING OF PRUSSIA, PENNSYLVANIA 19406
)
'
Docket No. 50-245
Fil 0 7 :gg;
pn f
6
/
N
nF
s Pt
'
Northeast Nuclear Energy Company
D [iJ'
l '} h
' '
'
D
.
7
ATTN: Mr. W. G. Counsil
2
Senior Vice President - Nuclear
i
- gy 2 7193] w ;-
J
Engineering and Operations
Zj
, , , , , , , , , ,
,,
P. O. Box 270
a
cowssa
y
Hartford, Connecticrt 06101
s,
p'
fh
Gentlemen:
'C
Subject:
Inspection 50-245/80-25
This refers to the routine inspection conducted by Mr. W. Sanders of this office
on December 15-18, 1980 and Januarj 27-30 and March 3-6, 1981 at Waterford,
Connecticut of activities authorized by NRC License No. DPR-21 and to the discuss-
ions of our findings held by Mr. Sanders with Mr. Farrel of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspectim
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section 2.790.
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
$105280 M
Q
.
.
Northeast Nuclear Energy Company
2
.
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
MA
e
Thomas T. Martin, Chief, Engineering
Inspection Branch, Division of
Engineering and Technical Inspectica
Enclosure: Office of Inspection and Enforcement Inspection
Report Number 50-245/80-25
cc w/ encl:
E. J. Mroczka, Station Superintendent
J. F. Opeka, System Superintendent, Nuclear Operations
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
.
.
e