ML19347F905

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-282/81-05 & 50-306/81-05 on 810301-0409.No Noncompliance Noted
ML19347F905
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 05/07/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gilberts D
NORTHERN STATES POWER CO.
Shared Package
ML19347F906 List:
References
NUDOCS 8105260575
Download: ML19347F905 (2)


See also: IR 05000282/1981005

Text

WO

e ,s

p* **:%'o

c1

.n

-

s

+4

UNITED STATES

$/

[

^

,,.,

g

NUCLEAR REGULATORY COMMISSION

/

g[g

- ;

n

r

REGION lli

Q

[

799 RCOsEVELT ROAD

y

  • @

% . . . . . g**

GLEN ELLYN, ILLINOIS 6013'

T

[

./

p\\4,

3

\\

., I

MAY 7

198f

{/

c%

Docket No. 50-282

Docket No. 50-306

Northern States Power Company

ATTN:

Mr. Dennis E. Gilberts

Senior Vice President

Power Supply

414 Nicollet Mall

Minneapolis, MN 55401

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

C. D. Feierabend and B. L. Burgess of this office on March 1 - April 9,

1981, of activities at the Prairie Island Nuclear Generating Plant, Units 1

and 2, authorized by NRC Operating Licenses No. DPR-42 and No. DPR-60 and

to the discussitn of our findings with Mr. Tierney and other members of his

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary triat you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

l

withholding; and (b) submit eithin twenty-five (25) days froa the date of

l

this letter a written application to this office to withhold such infor-

.

mation. Section 2.790(b)(1) requires that any such application must be

l

accompanied by an affidavit executed by the owner of the information which

I

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons on the basis which it is claimed that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

8195260575

.

,

Northern States Power

2-

-

Company

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss,any questions you have concerning this inspection.

Sincerely,

,

'

s

/2.-

R. F. Heishman, Acting Director

Division of Resident and Project

Inspection

Enclosure:

IE Inspection

Reports No. 50-282/81-05

and No. 50-306/81-05

cc w/ encl:

F.

P. Tierney, Jr.,

Plant Manager

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

PDR

Local PDR

NSIC

l

TIC

John W. Ferman, Ph.D.,

Nuclear Engineer, MPCA

,

.


e-

-- -, ,

, , .

-

+

c--

e

- - - -

- - , , , , ,


,r,,p

- - + , ,

w--