ML19347F734

From kanterella
Jump to navigation Jump to search
Revised Pages 3.5/4.5-8 to Amends 66 & 60 to Licenses DPR-29 & DPR-30,respectively.Pages Corrected to Reflect Amend Intent
ML19347F734
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 05/18/1981
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19347F735 List:
References
NUDOCS 8105260162
Download: ML19347F734 (2)


Text

,

n) f

=

v QUAD-CITIES DPR-29

2. De discharge pipe pressure for the 2.

Following any period h.ece the iscI systems in Specification 3.5.G.I shall stx!e of the PJR or C0re. pray KCS m

h^"* D**"

"t f

""I** d d S*d for e.2intenance, 'he discharge piping be maintained at greater than 40 Ps23 t

and less than 90 ps.ig. If pressure,n of the Inoperable system shall te i

any of these systems is less shart 40 vented frcra the high.oint prior to c

the return oc the syste;n to service.

psig or greater than90 psig, this con-dition shall be afarmed in the control room and immediate corrective action 3.

Whenever the llPCI or RCIC s} stem-taken. If the discharge pipe pressure is is lined up to take suction from the not within these limits in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> t rus, the discharge _ pipmg of the aner the occurrence, an orderly shut-HPCI and RCIC shall be vented from down sha!! be initiated, and the reae-the high point of the system and water tor shall be in a cold shutdown condi-ft w bserved on a monthly basis.

tion within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after initiation.

4.

'Ite pressure switches which ronitor the discharge li..es and the discharge t

of the fill systers prp to ensure that l

they are full shall be functionally tested every conth and calibrated every 3 conths. 'The pressure switches shall be set to alarm at a decreasing pressure of?.40 psig and an increasing pressure of$ 90 psig.

g-H.

Condensate Pump Rocm Flood Protection H.

Condansate Pump Room Flood Protection

1. The systems installed to prevent or
1. He following surveillance require-mitigate the consequences of flooding ments shall be observed to assure that cf the condensate pump room shall be the condensate pump room flood pro-operable prior to startup of the tection is operable.

The piping and electrical penetra-a.

2 The condenser pit water !cvel switches tions and bulkhead doors for the shall trip the condenser circulating vaults containing the RHR service water purnps and alarm in the control water pumps and diesel-generator room if water level in the condenser cooling pumps shall be checked pit exceeds a level of 5 feet above the during each operating cycle by pit floor. If a failure occurs in one of pressurizing to 15 i 2 psig and these trip and alarm circuits, the failed checking for leaks using a soap circuit shat! be immediately placed in bubble solution. The criteria fu a trip condition and reactor operation acceptance shall be no visible leak-shall be permissible for the fo!!owing age through the soap bubble 7 days unless. the circuit is sooner solution.

made operable.

b. The floor drains from t! e vaults.
3. If Specification 3.5.H.1 and 2 cannot shall be checked during each oper-be met, reactor startup shall not com-ating cycle by removing the end mence or if operati.ig, an orderly shut-cap and assuring that water can be down shall be initiated and the reactor run through the drain lines.

shall be in a cold shutdown condition c.

De RHR service water pump and within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, diesel generator cooling water pump bed plate drak.s shall be 18105 2 60 / loa g checked during e ch operating P00R ORIGINAL

-8

QUAD-CITIES DPR-30

~

2. The discharge pipe pressure for the 2.

rollowing any period where the txI rede of the FJGt or core spray EIS systems in Specification 3.5.G.! shall be maintained at greater than 40 psig f,",*,.Ij*n['cf'p',*,"jj'jd'h{d l

g, y

and Iers than 90psig. If pressure in of the ineperable system shall t, any of these systems is less than 40 vented recun the high seint prior to the return of the system to service.

psig or greater than 90psig, this con-dition shall be alarmed in the controi room and imrr.edia.e corrective action 3.

Whenever the IIPCI or RCIC system taken. If the discharge pipe pressure is is lined up to take suction from the not within these limits ist 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

& di W y pi g a m aner the occurrence, an orderly shut-HPCI and RCIC shall be vented from down shall be initiated, and the reac-the high point of the system and water tor shall be in a cold shutdown condt-fiow observed on a monthly basis.

tion within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> aner mitiation.

4 The pressure switches *.htch conitce the dischstge li.:es ard the discharge of the fill systers pep to ensure that they are full shall be functionally tested every enth at:d calibrated every 3 months. The pressure switches shell be set to alarm at a dacreasing pressure of ?.40 psig anri an ir: creasing pressure of s90 psig.

g i

H. Condensate Pump Room Flood Protection H. Condensate Pump Room Flood Protect on

,l.

The systems installed to prevent or

1. The following surveillance require-mitigate the c,anseqt!cnces of flooding ments shall be observed to assure that of the condensate pump room shall be the condensate pump room flood pro-operable prior to startup of the tection is operable.

De piping and electrical penetra-a.

tions and bulkhead doors for the

2. ne condenser pit water level switches

- vaults containing the RHR service shall trip the condenser circulatin5 water pumps and alarm in the control water pumps and diesci. generator room if water !cvel in the condenser cooling pumps 1 all be checked h

pit exceeds a level of 5 feet above the during each' operating cycle by pit Hoor. If a failure occurs in one of pressurizing to 15 i 2 psig and these trip and alarm circuits, the failed checkir.g for leaks usins 2 503P circuit shall be immediately placed in bubble solution. The criteria for a trip condition and reactor operation acceptance shall be no visible leak-shall be permissib!c for the following age through - the soap bubble 7 days unless the circuit is sooner solution.

made operable.

b. The fioor drains from the vaults
3. If Specificatica 3.5.H.! and 2 cannot shall be checked during ea'ch oper-be met. reactor startup shall not com-sting cycle by removing the end mence or if operating, an orderly shut-cap and assuring that water can be down shall be initiated and the reactor run through the drain lines.

shall be in a cold shutdown condidon The RHR service water pump and c.

within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

diesel generator coolin5 water pump bed plate drains shall be checked during each operating P00R ORIGINAL Amendment No. 60

..