May 18, 1981 m
e-Docket Nos.:
50-373 and 50-374 9 4
<.\\
s
'N
- -s
/
Commonwealth Edison Company g
g 3 'y 4
ATTN: Mr. J. S. Abel Director of Nuclear Engineering-6 (P jg7 N L(, g P. D. Scr. 767 Chicago, Illinois 60690
Dear Mr. Abel:
Subject:
La Salle County Station Unit No.1 Seneaule Delay Our letter of March 13, 1981 from H. R. Denton to d. J. O' Conner transmitted a listing of plants showing our revised accelerated schedules for important dates in ti,e licensing process. The purpose of this schedule was to establish a work load scheduling for the NRC Office of Nuclear Reactor Regulation that-would, to the extent possible, minimize the impact of the licensing and hearing process on plant availability. To that end, we addressed the current schedule
~
for NRC staff's technical input to.the Nuclear Reactor Regulation Division of--
va notect that all Licensing for its next action in the licensing procecs.
information concerning your application identified as needed by the staff must be provided by you or your contractors at least two weeks prior to tne scheduled staff's technical input date.
For La Salle, the next action, as specified in that March 13, 1981 letter is the Supplemental Safety Evaluation Report (SSER). To meet our licensing schedule on the SSER, we required input on or before April 15, 1981.
You failed to meet Your submittal addressing most items was not received until May 5, that date.
1981, almost three weeks late.
. While we will make every effort to minimize the impact of your tardiness on the completion of our review and issuance of the SSER, you should understand that We solicit there will be some impact on completion of the licensing process.
your highest priority to completely resolve the remaining open issues, including submission of your responses to all outstanding information requests.
d 9
f
i
/
WAV lD Mr. J. S. Abel We urge you to pay particular anuni. ion to the area of equipment qualifico"--
since this appears to be one at tne more significant outstanding review areas.
In order to ensure meeting your projected fuel loading date, it is imperati,c that all of the required information be provided to us by July 10, 1981.
With prompt attention to thesc :: t:tanding matters, we believe we can still complete the licensing process en x not to impact your currently projected construction completion date of Optember 15, 1981, which is projected in your May 5,1981 letter.
Sincerely, FMG4-ca s
Robert L. Tedesco, Assistant Director for Licensing Division of I.icensing cc: See next page
=
.e l
I P00R OftlGINAL t"
D
1*
- .:,1
- ? txt
~
- Mr. J. S. Abel Director of Nuclear Licensino Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690 cc:
Philip P. Steptoe, Esc.
Suite 4200 One First National Plaza Chicago, Illinois 60603 Dean Hansell, Esquirc Assistant Attorney General 188 West Randolph Street Suite 2315 Chicago. I'llinois 60501 Mr. Roger Walker, Resident Inspector U. S. Nuclear' Regulatory Commission Post Office Box 224 Marseilles, Illinois 61354
.n e
i l
l I
g.2..
. =
9ssW-
'8he' N'-
3,r
.g
.e 4>
UNITED s't,' ??s
.g NUCLEAR REGULATORY CO.WilSSION g
5 j
WASHINGTON, D. C. 20550 May 18, 1981
%.....,o J
Docket Nos.:
50-373 and 50-374 Commonwealth Edison Company ATTN: Mr. J. S. Abel Director of Nuclear Engineering-i P. O. Box 767 Chicago, Illinois 60690 L
Dear Mr. Abel:
i
Subject:
La Salle' County Station Unit No.1 Schedule Delay Our letter of March 13, 1981' from H. R. Denton to J. J. 0' Conner transmitted a listing of plants showing our revised accelerated schedules for important dates in the licensing process. The purpose'of this schedule was to establish-l a work lcad scheduling for the NRC Office of Nuclear Reactor Regulation that l
would, to the extent possible, minimize the impact of the licensing and hearing process on plant.. availability. To that end, we addressed the current schedule
~
for NRC staff's technical input to,the Nuclear Reactor Regulation Division of Licensing for its next action. in the licensing process. We noted that all information concerning your application identified as needed by the staff must be provided by you or your contractors at least two weeks prior to the scheduled staff's technical input date.
For La Salle, the next action, as specified in that March 13, 1981 letter is the Supplemental Safety Evaluation Report (SSER). To meet our licensing schedule on the SSER, we required input on or before April 15, 1981. You failed to meet.
that date. Your submittal addressing most items was not received until May 5, i
1981,* almost three weeks late.
While we will make every effort to minimize the impact of your tardiness on the completion of our review and issuance of the SSER, you should understanti that there will be some impact on completion of the licensing process. We solicit your highest priority to completely resolve the remaining open issues, including submission of your responses to all outstanding information requests.
i e
A
- s
. _... -. _. _. _ _... _ _ _. _ _ _.,. ~ _ _ _.... _
MAY 1 8 1961 Mr. J. S. Abel We urge you to pay particular attention to the area of equipment qualification since this appears to be one of the more significant outstanding review areas.
In order to ensure meeting your projected fuel loading date, it is imperative that all of the required information be provided to us by July 10, 1981.
With prompt attention to these outstanding matters, we believe we can still complete the licensing process so as not to impact your currently projected construction completion date of September 15, 1981, which is projected in your May 5,1981 letter.
Sincerely, Fd%< tea Robert L. Tedesco, Assistant Director for Licensing Division of Licensing cc: See next page l
~=
.,e,-
1 I
l 4
1
=
}
+
Mr..J..S. Abel Director of Nuclear Licensing Comonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690 cc: Philip P. Steptoe, Esq.
Suite 4200 One First National Plaza Chicago, -Illinois 60603 Dean Hansell, ' Esquire Assistant Attorney General 188 West Randolph Street l
Suite 2315 l
Chicago, Illinois 60601 Mr. Roger Walker, Resident Inspector-U. S. Nuclear Regulatory Comission Post Office Box 224 l
Marseilles, Illinois 61364 l
l 1
D.
,g-s
/
~
c l
i I
t I
t I
t l
\\
ikQ.,y[_';N N5f._~;*^.^*'f::y.lV ? ?D.TT *S'~T!;"*?4 Ll:? ^*r*'$QT U#hXW:?':^?W%$$ *Yk'i*.
"'?;'Yl Y
- S *
. m
. ~,
e e
r m
+.m -w-----,w'-
g
.,em.,,,p.+-..
.=,p.gw-r-h-+
p 4r-g'PE M
'T
--wgp-+rw W--NWTe
? e w-t v -N9'$'
=ntee 4 r+w y -' e t-'98r
-='9--^e-*r**P-'
W
'*d4
--4rr"w