Forwards IE Insp Repts 50-454/80-25 & 50-455/80-23 on 801215-19,22-23,31,810109,12 & 0327 & Notice of Violation
ML19347F698
Person / Time
Site: Byron  Constellation icon.png
Issue date: 04/17/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19347F699 List:
References
NUDOCS 8105260068
Download: ML19347F698 (2)


See also: IR 05000454/1980025

Text

ne.

/

Do

UNITED STATES

!

NUCLEAR REGULATORY COMMISSION

o

y

.E

REGION lli

,

o

799 RGOSEVELT ROAD

GLEN ELLYN, ILLINOIS 60137

.....

-

-

.

'AFk . j 7 66:

X I: r w c3

' Docket No. 50-454

.

gj

f

V

,p

.

Docket No. 50-455

.O

W

fg

_

-

MnY2119g y[I

Commonwealth Edison Company

17

u.s. %

cows %,e "

l

ATTN:

Mr. Cordell Reed

so

-

Vice President

g

Post Office Box 767

p

,

Chicago, IL 60690

4

Gentlemen:

This refers to the inspection conducted by Messrs. K. R. Naidu, R. N. Gardner,

R. L. Lee, C. Braund, and J. Boone of this office on December 15-19 and 22-23,

1980, of activities at Byron Nuclear Power Station Units 1 and 2 authorized

by NRC Construction Permits No. CPPR-130 and No. CPPR-131 and to the discus-

sion of our findings with Messrs. C. Reed, J. Maley and others of your staff

during management meetings at the Region III office on December 31, 1980,

and January 9, 1981. This acknowledges the meeting with Messrs. J. Maley,

V. Schlosser and J. Abel of your staff on January 12, 1981, at our office

during which the content of an Immediate Action Letter dated January 13, 1981,

was discussed. This also refers to the enforcement conference between us and

members of our staffs on March 27, 1981, at our office.

The enclosed copy of-our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

l

interviews with personnel.

"

l

During the inspection, we found several deficiencies in Commonwealth

'

Edison Company's quality assurance program as related to the electrical

l

installation contractor's activities. The inspection disclosed apparent

ncacompliance with seven different criteria for a quality assurance program

as set forth in 10 CFR 50 Appendix B including such significant deficiencies

as (1) failure to apply QA program requirements to the design, construction,

purchase, and installation-of a safety-related component, (2) failure to

adequately translate design documents into drawings, instructions and proce-

dures, (3) failure to identify and correct deviations and nonconformances,

,

(4) failure to establish procedures, and (5) failure to follow procedures.

l

As described in the enclosed Appendix A, a written response is required for

l

these apparent noncompliances. We are very concerned about Item 1 and ask

!

that you give special attention to your response to this matter to ensure

I

that causal factors are clearly identified and that positive corrective

actions are taken to avoid repetition of this significant matter.

!

-

l

We wish to call your attention to the fact that we strongly considered

i

classifying the deficient implementation of your quality assurance program

i

in the electrical and instrumentation installation area as Severity Level III.

1

l

8105 2 c o 0W

p

-

.

_

,

.

Commonwealth' Edison Company

- 2.-

p

7 ,

Only after a great deal of evaluation effort did we conclude that the defi-

cient implementation was not indicative of a breakdown of the program in that

urea and, accordingly, that Severity Level IV rather than III characterizes

the most significa1t violations. Your reply to this letter and ,the rcsults

of future inspections in this area will' be considered in determining whether

escalated enforcement action may be appropriate.

In accordance-with Sect'an 2.790 of the'NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures ~,

<

and your response to this letter will be placed-in the NRC's Public Document

Room, except as follows.

If the enclosures-contain information that you or

-your contractors believe to be proprietary, you must apply in writing to

this office, within twenty-five days of the-date of this letter, to withhold

such information from public disclosure. The application must include a. full

statement of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in zhe

application is contained in an enclosure to the application.

We will gladly discuss any questions you have concerning this inspection.

.

,

Sincerely,

G

G OdoQ w

[JamesG.Kappler

Director

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-454/80-25 and

No. 50-455/80-23

cc w/encls:

J. S. Abel, Dir. of Nuc. Lic.

Gunner Sorensen, Site Proj. Supt.

V. I. Schlosser, Proj . Mgr.

R. E. Querio, Sta. Supt.

Central Files

Reproduction Unit NTC 20b

PDR

Local PDR

NSIC

TIC

Mary Jo Murray, Office of

' Assistant Attorney General

Myron M. Cherry

.

.

,

,,