6
_,M, w Mh Y$v['
Florida IP b Po,o a, e,,0.wr
,g coa h
May 14,1981 k4*
,/ u
,. 9 /
- 3-051-38 i s.
w /
e. :.. -.
Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
SUBJECT:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DRR-72
REFERENCES:
December 22, 1980 Letter to All Licensees NUREG-0612 " Control of Heavy Loads at Nuclear Power Plants" February 3,1981 Letter to All Licensees
Dear Sir:
Your December letter, referenced above, requested that Florida Power Corporation perform certain interim actions and that additional information regarding load handling be provided the Staff by various deadlines.
It was necessary that Florida Power Corporation perform much of this work via contract (s) with qualified consul-tant (s). Due to the scope and need for accuracy, we are unable to meet the schedule requested by your letters. We propose the following schedule:
Interim Measures
- Draft May 15, 1981 (except Training and Special Review)
Reviewed June 30, 1981 Training Program Reviewed May 15,1981 Revised June 30,1981 l
l Completed Prior to Refueling **
Special Review (over core)
Completed Prior to Refueling **
General Information (2.1)
Submitted August 30, 1981 Specific Information (2.2, 2.3, 2.4)
Submitted January 31, 1982 l
l Required Modifications Completed January 31, 1984
- Implementation of new/ revised procedures will be accomplished in conjunction with A
ccmpletion of any necessary training.
ll001
- Scheduled for September 19, 1981.
3
/!D General Off e 3201 inirty fourin street soutn. P o Box 14042. st Petersbuq Florica 33733 813-866-5151 8105220 @(p f
t' Mr. Darrell G. Eisenhut Page 2 May 14, 1981 -
This schedule is consistent with the intent of the modified schedule provided _in your February letter in most areas. This schedule represents a continued high priority being given this area by Florida Power Corporation. To tta extent prac-ticable, partial work will be completed well before the scheduled submittal /com-pletion date but critical items will require the full time allotted.
Your concurrence with this revised schedule is hereby requested.
Very truly yours, FLORIDA POWER CORPORATION r
g, l. )'krspra 's eP. Y. Ehynard Manager Nuclear Support Services KRW/gs cc: Ken 'filson Document Control (2) i l