Responds to NRC Re Violations Noted in IE Insp Repts 50-269/81-05,50-270/81-05 & 50-287/81-05.Corrective Actions:Incorporated Slag Interpretation in Radiographer Training Program
ML19347F542
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/28/1981
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19347F541 List:
References
NUDOCS 8105200004
Download: ML19347F542 (2)


Text

.

.',d O

' '.. u p DUKE PoO, dd DOMPANY Powen Boss.oixo 4c2 Socrn Cnuncu Srazer. CnAntoTTE. N. C. 20242 l J 9 30 i:

lC wi w au o. P4naca.sn.

April 28, 1981 TcLtp omt:Anta 704 Scr PatsiorNT Setsu PaoouctioM 373-4083 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region 11 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re:

RII 50-269/81-05 50-270/81-05 50-287/81-05

Dear Sir:

With regard to R. C. Lewis' letter of Agril 3, 1981 which transmitted the subject inspection report, Duke Power Company does not consider the information contained therein to be proprietary.

Please find attached a response to the cited iten of noncompliance.

I declare under penalty of periury that the statements set forth here-in are true and correct te, the best of my knowledge, executed on April 28, 1981.

el Ve y truly yours'

< w N

i Ow_ d, ht4 ( <.4.__ '.

' William O. Parker, Jr s' t

FTP/mwk Attachment 810s200004

. -_~

. _ =

= %gP, -

DUKE POWER COMPANY OCONEE NLfCI. EAR STATION Response to IE Inspection Report-50-269/81-05, -270/81-05, -287/81-05 i

Violation i

10 CFR 50, Appendix B, Criterion V as implemented by Topical Report Duke-1-A, Section 17, paragraph 17.1.5 requires in part, instructions, j

procedures or drawings shall include appropriate quantitative acceptance criteria for determing that important activitier have been satisfac-torily accomplished. The licensee's Radiography Procedure, NDE-10 speci-fies that welds that are shown by radiography to have discontinuities (slag inclusions) greater than the length permitted herein are unacceptable.

Contrary to the above, unacceptable slag inclusions shown on radiographic films in weld joint W-6, ISO 19A-25 were not rejected.

Response

System 19A, which is partially shown on ISO 19A-25 is the intake air line to the diesel engines in the Standby Shutdown Facility.

This line is classified as Duke Class C and sees only atmospheric pressure.

l The radiographic film for weld joint 6, view 4-5 on ISO 19A-25, showed indications which were read by the radiographer to the concavity. When questioned by the NRC inspector, the radiographer agreed to have the weld ground within the areas of view 4-5.

This was done and some slag was found.

Duke Power concurs that a violation did occur, and it resulted from an error in interpretation by the radiographer in reading the film for view 4-5 of weld joint 6 on ISO 19A-25. While the slag inclusion is felt 4

to be of minor importance in this instance, the weld was repaired and re-radiographed with acceptable results. The matter of the error in inter-pretation was discussed with the radiographer by supervision. Additional emphasis on slag interpretation will be incorporated with the training program for Duke Power radiographers, and the radiographer in question will be retrained in this area. This will be accomplished by June 1, 1981.