ML19347F430
| ML19347F430 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/12/1981 |
| From: | Baynard P FLORIDA POWER CORP. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-3.D.1.1, TASK-TM 3-041-35, 3-41-35, NUDOCS 8105190266 | |
| Download: ML19347F430 (1) | |
Text
.
~
4 3,
Nfida Pw m.o.e.. _e r May 12, 1981
/k
(
'y NL g
- 3-041-35 File: 3-0-30/QP
"#.. ' l 3 ISS J x 3-0-3-a-6 Mr. Darrell G. Eisenhut
" " he ensure.,
'85 5 "
Director of Licens'ing it Division of Operating Reactors
u /py U.S. Nuclear Regulatory Commission
'C Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 NUREG-0737 - Post-TMI requirements Item III. D.1.1
Dear Mr. Eisenhut:
By letter dated December 15, 1980, Florida Power Corporation committed to install an auxiliary building cubicle door for positive ventilation control by the end of the first quarter of 1981.
However, due to field construction problems causing a redesign, we were unable to meet the projected date.
With the manufacturer's projected delivery date (once the redesign is completed and the door ordered), and the reouired installation time, the door will be installed during the Fall 1981 refueling outage.
Should you have any questions concerning this revised implementation date, please contact this office.
Very truly yours, p
aynd Dr. P. Y. Baynard Manager y
Nuclear Support Services 0,76 s
Enclosure Tibbs(R02)C-1 1
General Office 3201 inirtydeurtn street scutn. P o ec.14c42. sr Peterscurg Fcrca 33733 513 - 866-5151 8105190 %f f i