Requests Extension for Implementation of NUREG-0612 Interim Position Requirements Re Control of Heavy loads.Six-month & 9-month Repts Will Be Completed by 810911 & 1211, Respectively
ML19347F070
Person / Time
Site: Oyster Creek
Issue date: 05/08/1981
From: Finfrock I
JERSEY CENTRAL POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0612, RTR-NUREG-612 NUDOCS 8105150186
Download: ML19347F070 (1)


Text

~

OYSTER CREEK NUCLEAR GENERATING STATION JCP&L GPU n'TCN?fm5%

(609)693-6000 P O BOX 388

  • FORKED RIVER
  • 08731 Car er.v P cs : unee. S,wm May 8, 1981 Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory C%xmlission Washington, D.C. 20555

Dear Mr. Eisenhut,

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Control of Heavy Ioads (Generic Ietter 81-07)

Staff Interim Position By your letters of February 3,1981 and December 22, 1980, the due date for implementation of the " Interim Position" recuirements is May 15, 1981, and the due dates for the six (6) and nine (9) month reports are June 22 and Septerber 22, 1981 respectively. Due to adminis-trative difficulties which have been aggravated to a large degree by our current maintance outage, it appears that the evaluation of our degree of (xxpliance as well as the inplementation of these requirements will not be completed by the above dates.

Faced with this inevitability, JCP&L is contracting with a consulting firm experienced with the requirenents of NUREG 0612 to assist in the implenentation of the interim position and preparation of the six (6) and nine (9) nonth reports. The current schedule reflects the full implerentation of the interim position and carpletion of the 6 nonth report by September 11, 1981 with the 9 month report to be subuitted by Decarber 11, 1981. This new schedule rtill insures that the interim position will be impleuented prior to our refueling outage in Noverber of this year.

Should you or a rurber of your staff require nore information on these topics please contact Mr. M. Laggart of my staff at (609) 693-6932.

Very truly yours, GV1 Ivan R. Finfr

,, J Vice President-JCPa Director-Oyster Creek g

cc: Resident USNBC Inspector ly Oyster Creek Nuclear Generating Station i

Ebrked River, N.J. 08731 8105150/JTO

[

---