ML19347E869

From kanterella
Jump to navigation Jump to search
Amend 6 to License DPR-77,changing Installation & Operation of Radiation Monitors to Fluid Lines from May 1981 to Prior to Operation Following First Refueling
ML19347E869
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 04/27/1981
From: Adensam E
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19347E870 List:
References
NUDOCS 8105140114
Download: ML19347E869 (2)


Text

ta "8 ?og'o,,

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

(m)y

,E WASHINGTON, D. C. 20556

\\p...../

TtNNESSEE VALLEY AUTHORITY DOCKET NO. 50-327 SEQUOYAH NUCLEAR PLANT, UNIT 1 AMENDMENT TO FACILITY CPERATING LICENSE Amendment No. 6 License No. DPR-77 1.

The Nuclear Regulatory Commission (the Commission) having found that:

A.

The applications for amendment to the Sequoyah Nuclear Plant Unit 1 (the facility) Facility Operating License No. DPR-77, filed by the Tennessee Valley Authority (licensee), datcd Decembu.' 30, 1980 and

?,pril 22, 1981 comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in coriformity with the license, a amended, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authcrized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Conmission's regulations and all applicable requirements have been satisfied.

2.

The license is hereby amended to chance the following paragraph:

(22) TMI Action Plan Full Power Conditions F.

Radiation Monitors (Section 22.2 II.E.4.2)

TVA will install Radiation Monitors for isolation of fluid lines carrying potential radioactivity outside of containment at the earliest prac1.ical date consistent with scheduled or forced plant outages but prior to operation following the first refueling.

18105140/[y

. 3.

This amended licensa is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION 4: L hdm-Elinor Mensam, Acting Chief r

Licens ng Branch No. 4 i

Division of Licensing t

t Dat'ed:

April 27,1981 i

t a

I I

I i

i.

i l

1 E

i i

I k

t l

I

__