Forwards IE Insp Repts 50-553/81-02 & 50-554/81-03 on 810311-13.No Noncompliance Noted
ML19347E838
Person / Time
Site: Phipps Bend  
Issue date: 04/02/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19347E839 List:
References
NUDOCS 8105140004
Download: ML19347E838 (2)


See also: IR 05000553/1981002

Text

I

o

UNITED STATES

/

g

f[

NUCLEAR REGULATORY COMMISSION

g

t

a

REGION II

[

101 MARIETTA ST

N.W.. SUITE 3100

ATLANTA, GEORGIA 30303

.....

Q

APR 2

19 81

'gg

V

'

%. $ T

h

,

Tennessee Valley Authority

'

,

Oo

t

ATTN:

H. G. Parris

-

"

7

kg@%

Manager of Power

gk

8

500A Chestnut Street Tower II

Chattanooga, TN 37401

i.

Gentlemen:

Subject: Report Nos

This refers to the routine inspection conducted by J. L. Coley of this office on

March 11-13, 1981, of activities authorized by NRC Construction Permit Nos. CPPR-

162 and CPPR-163 for the Phipps Send facility and to the discussion of our find-

ings held with W. P. Kelleghan at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examihed actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enc'iosed inspec-

tion report will be placed in the NRC's Public Document Room. If this report

contains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this office

to withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of tne

document.

If we do not hear from you within the specified period, the report

will be placed in the Public Document Room.

.

81051400tX/

'

APR 2

1981

-

Tcnn;ssna Vallcy Authority

2

'

Sb:,uld you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

$C.

R. C.

ewis, Acting Director

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report Nos. 50-553/81-02

and 50-554/81-03

cc w/ encl:

H. J. Green, Division Director

~

W. P. Kelleghan, Project Manager

J. F. Cox, Supervisor, Nuclear

Licensing Section

J. E. Wills, Project Engineer

H. N. Culver, Chief, Nuclear

Safety Review Staff