Forwards IE Insp Rept 50-213/81-02 on 810119-0227.No Noncompliance Noted
ML19347E605
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 04/21/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML19347E606 List:
References
NUDOCS 8105130118
Download: ML19347E605 (2)


See also: IR 05000213/1981002

Text

_

_

'

..

,

.

%,

UNITED STATES

!

NUCLEAR REGULATORY COMMISSION

,m

o

$

f

,[ '

(~

REGION 1

.

,

631 PARK AVENUE

Kiwa oP PnussiA. PENNSYL.VANIA 19406

I

g

-

A-

  • ....

-

Docket No. 50-213

APR 21 SH

{

D

j

J 2 b

Connecticut Yankee Atomic Power Company

7

ATTH: Mr. W. G. Counsil

s'v

4

Vice President - Nuclear

y

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection 50-213/81-02

This refers to the routine inspection conducted by Mr. T. H. Smith of this

office on January 19-February 27, 1981 at the Haddam Neck Plant, Haddam,

Connecticut of activities authorized by NRC License No. OPR-62 and to the

discussions of our findings held by Mr. Smith with Mr. R. H. Graves of your

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

,

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any inforrettion that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information from public disclosure. Any

such application raust be accompanied by an affidavit executed by the owner of

the information, which identifies the document or part sought to be withheld,

and which contains a statement of reasons which addresses with specificity the

items which will be considered by the Commission as listed in subparagraph (b)

(4) of Section 2.790. The information scught to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not hear

from you in this regard within the specified period, the report will be placed

in the Public Document Room.

\\

\\

\\

l

r

810513018

l

--

-.

-- -

-

--.

.

' '

. .

.

e

APR 211981

'

Connecticut Yankee Atomic

2

Power Company

i

,

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

ed

m

E don . Brunner, Chief

Pro'jects Branch #1, Division of

' Resident and Project Inspection

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-213/81-02

cc w/ encl:

R. Graves, Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer

J. F. Opeka, System Superintendent, Nuclear Operations

,

bec w/ encl:

-

IE Mail & Files (For Appropriate Distribution)

Central Files

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

Technical Information Center (TIC)

REG:I Reading Room

State of Connecticut

NRC Resident Inspector

Chief, Operational Support Section (w/o enc 1)

,

'l

l

.

-

-

-

.,