O Accendix A NOTICE OF VIOLATION Gulf States Utilities comoany Docket No. 50-458 CPPR-145 As a result of the inspection conducted on January 28, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980), the following violation was identifieo.
Failure to Procerly Record Amount of Water Added to Concrete in Truck Criterion X of Aopendix B requires that a program be established and executed by or for the organization performing the activity to verify confonnance with the documented procedures for accomplishing the activity.
Stone and Webster Specification 210.350, Revisien 2, " Specification for Mixing and Delivering Concrete," states that, "the amount of withheld water added and slump measured after the final addition of water shall be recorded on truck delivery tickets."
Coctrary to the above:
On January 26,1981, during t."e final water addition to a truck load of concrete identified on Batch Ticket 16574, the National Mobile Concrete Corporatian (NMCC) CA Director, in accordance with the above specification requirement., recorded that 12 gallons were added to the truck load.
However, data on the batch ticket indicated that tne quantity of 9 gallens was the maxin'um amount of water allcwed to be added without execeding the allowed water. cement ratio. The number on the batch ticket was subsecuently crossed out and replaced by "9" gallons.
The IE inspector determined that the NMCC QA Director did not verify con-formance with the documented procedure in that he did not actually verify the amount of final water added to the truck for entry on the truck delivery ticket.
Stone and Webster batch clant insoection personnel, ucon discovery that the original batch ticekt information had been changed, initiated a type C inscection recort, IRS 1000 329, documenting that 12 gallons of water had been actually added.
~his is a severity Level IV vio'ation (Suoplement II).
81isue593
j e
, Pursuant to the provisions of 10 CFR Part 2.201, Gulf States Utilities Company is hereby required to submit to this office within twenty-five days of the date of this Notice, a written statement or explanation in reply including:
(1) the corrective steos which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as ameaded, this response shall be submitted under oath or affirmation.
N dated:
3-4 f !
W. C. Settle, Chief Engineerin) Inspection Branch 1
.-